High Speed Rail Belgrade to Nis

Case Number 2025/01

Title Of Case

High Speed Rail Belgrade to Nis

Project Number

53136

Case Name

High Speed Rail Belgrade to Nis

Location

Serbia

Function Requested

Problem-solving and Compliance

Confidentiality Request

Yes

Submission date

15 December 2024

Status

Closed

Request summary

On 15 December 2024 members of the Citizen Group of Jagodina, submitted a request to IPAM concerning the High Speed Rail Belgrade to Nis Project (OP ID 53136) in Serbia, after intensive engagement with the EBRD, the Client and local authorities. Requesters are raising concerns regarding the rehabilitation and upgrade of the existing railway going through Jagodina. They are particularly concerned about the closure of the current level crossing in the center of Jagodina, as in their view this would increase traffic congestion, air, and noise pollution. They further claim public safety risks due to potential release of hazardous substances in case of accidents. They also claim that the Client has not addressed the concerns they raised during public consultations. 

During the Compliance Assessment, IPAM was informed of a material change in the Project. On 26 March 2026, the Serbian authorities decided to relocate the railway alignment outside the urban area of Jagodina, and that decision was subsequently confirmed to IPAM by both Bank Management and Client. As the Request was directed at the impacts associated with the initial alignment through the city, IPAM concluded that the specific harms alleged by the Requesters were no longer expected to materialise under the Project as currently envisaged. In light of these anticipated modifications, the issues raised in the Request no longer appear to apply to the Project configurationnow under consideration.

Accordingly, although IPAM’s preliminary findings indicate that Case 2025/01 would otherwise have met the criteria to proceed to a Compliance Review in relation to the initial alignment, IPAM concludes that the Case does not meet the requirements for initiating a Compliance Review in respect of the Project as currently envisaged. The Case was thus closed on 17 June 2026.

 

.

Case tracker

Stage Status Documents
Registration Registered

2025/01 Request

PDF format / 0.16MB
Download

24 Jan 2025

Assessment Completed

2025/01 Assessment Report ENG

PDF format / 0.41MB
Download

14 July 2025

2025/01 Assessment Report SER

PDF format / 0.38MB
Download

14 July 2025

Problem-solving N/A
PS monitoring N/A
Compliance assessment Case Closed

2025/01 Compliance Assessment Report ENG

PDF format / 1.33MB
Download

17 June 2026

2025/01 Compliance Assessment Report SER

PDF format / 1.35MB
Download