Log in

Search

Other ways to explore content

EBRD projects News stories Contacts
Case Number 2023/08

Title Of Case

Corridor Vc 2 (Request #3)

Project Number

47372

Case Name

Corridor Vc 2 (Request #3)

Location

Bosnia and Herzegovina

Requester(s)

Mr Ilijas Sakic

Function Requested

Problem-solving and Compliance

Confidentiality Request

No

Reception Date

12 July 2023

Status

Open

Request summary

On 13th July 2023, Mr Ilijas Sakic, a resident of Bosnia and Herzegovina, sent a request in relation to the Corridor Vc 2 project.

The request raises allegations of structural damage to his property and dust pollution caused by the continuous traffic of heavy vehicles involved in the construction stage of the project. He contacted the Client and Contractor but none of them provided a solution to the problem. 

.

Case tracker

Stage Status Documents
Registration Registered

2023/08 Request ENG

PDF format / 0.07MB
Download

24 Aug 2023

2023/08 Request BOS

PDF format / 0.09MB
Download

24 Aug 2023

Assessment Completed

2023/08 Assessment Report ENG

PDF format / 0.79MB
Download

02 Feb 2024

2023/08 Assessment Report BOS

PDF format / 0.57MB
Download

02 Feb 2024

Problem-solving Agreement reached

2023/08 Problem Solving Summary ENG

PDF format / 0.72MB
Download

14 Mar 2025

2023/08 Problem Solving Summary BOS

PDF format / 0.72MB
Download

14 Mar 2025

PS monitoring Case is here
Compliance assessment
Compliance review
MAP monitoring