Reconstruction and modernization of Belgrade – Niš Railway Line, Section 3 Paraćin – Trupale – Medjurovo (excluding subsection Stalac - Djunis) -9738-IFT-53136

Project ID 53136

Document last updated 16 August 2026

Procurement Ref No.

9738-IFT-53136

Location

Serbia

Industry Sector

Transport

Funding Source

Credit from the EIB and EBRD and Investment Grant from the WBIF

Notice Type

Invitations to Submit Proposals (Open Competitive Procedures)

Contract Type

Project goods, works and services

Issue Date

04 August 2026

Closing Date

01 October 2026 at 23:59

INVITATION FOR TENDERS

Works

Project ID: EIB-GtP/MOB 1/2021/3.4-3 & 3.4-4

The Republic of Serbia hereinafter referred to as the Purchaser, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development, European Investment Bank and Western Balkans Investment Framework towards the cost of Serbia Rail Corridor X – Belgrade to Nis Section / Serbia Corridor X Railways FL - Global Gateway.

The Purchaser/Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan:

  • The Works Contract covers Section 3 of the Belgrade - Nis Modernization Project, which is divided into four subsections (subsection 3.2 Stalac - Djunis is already contracted). The works relate to Subsections 3.1 Paracin-Stalac, 3.3 Djunis-Trupale and 3.4 Trupale Medjurovo. Subsection Paracin-Stalac is 20.8 km long, while Subsection Djunis-Trupale is 37.7 km long and Subsection Trupale - Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernized to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale-Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across all Subsections 3.1, 3.3 and 3.4, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signaling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signaling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited work on neighboring sections may be included in the scope of the contract. Period of implementation of tasks 36 months for the preparation and approval of designs, execution and completion of construction works and 24-month period for defects notification. The scope of the works will include the following (the list is not exhaustive):

- Reconstruction and construction of the permanent way (substructure and superstructure);

- Architectural buildings in ten (10) railway stations with an overall surface area of 9,500 m2;

- Demolition of seven (7) existing railway single-track steel bridges (total length 125 m), and nine (9) existing railway single-track concrete bridges (total length 67 m);

- Construction of ten (10) new two-track reinforced concrete bridges (total length 305 m), four (4) new two-track reinforced concrete prestressed bridges (total length 570 m), three (3) new reinforced concrete road bridges (total length 45 m), ten (10) new reinforced concrete prestressed overpasses (total length 2022 m) and nineteen (19) new reinforced concrete underpasses (total length 330 m);

- Construction of eight (8) new reinforced concrete box culverts (width 5.00 m) and thirty-five (35) new box culverts (sizes 2.00x2.30m);

- Construction of a new tunnel about 550 m long;

- Electric power installations in railway stations, tunnel and tunnel entrance facilities;

- Electrical power installations for energy facilities (PSN, PS), relay stations, sectioning posts, sectioning posts with neutral section, remote control of fixed installations for electric traction, transformer stations supplied from overhead contact lines, overhead contact lines, lighting of grade separated crossings and access roads.

 Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from any country. The proceeds of the Bank's loan will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations.

Detailed information on how to access the Procurement Documents is available on the following website https://arhiva.infrazs.rs/medjunarodne-nabavke/ .

Unless amended during the tendering process, tenders must be delivered to as per instructions provided in the Procurement Documents on or before 12:00 Central European Time (CET) on 02 October 2026.

Prospective tenderers may submit request for clarifications to the Client at the following address:

Serbian Railway Infrastructure JSC

Contact point: Janko Kovljanic

Address: Nemanjina 6, 11000 Belgrade

Email: lnvesticije.projekatbn@srbrail.rs

Tel: +381 66 8404234 

Requests for clarification shall be received by the Client no later than twenty-one (21) calendar days, prior to the deadline for submission of applications. Clarifications will be published on the Client website https://arhiva.infrazs.rs/medjunarodne-nabavke/ at the latest 11 days before the submission deadline.