Project Description

The project will construct and operate an on-site air separation plant to upgrade the quality and reliability of oxygen and other industrial gases supplied to Severstal and to improve energy efficiency. Air Liquide will provide managerial and technical know-how to the JV and Severstal will ensure a long-term off-take for produced oxygen and other industrial gases from the newly created company. This is consistent with the outsourcing arrangements that Air Liquide operates around the world.

The additional project (op id 41626) starting in 2010 includes construction and operation of an additional on-site air separation plant to substantially upgrade the quality and reliability of oxygen and other industrial gases supplied to Severstal and to improve energy efficiency. The additional project replicates the main project completed in 2007 in all major parameters.

Transition Impact

  • Demonstration of new replicable behaviour and activities of a major Russian steel company: Severstal will serve as an example of restructuring in the Russian steel sector. Co-operation with leading global companies is an important element in Severstal’s business strategy. Outsourcing Severstal’s air separation production to Air Liquide – a leading global supplier of air separation technology, processes and services will further promote this process and serve as an example to other major Russian steel producers.
  • The proposed project will introduce the most advanced technology worked out by Air Liquide for industrial gases production and supply, providing a high-profile model for the transfer of modern technology and know-how into a major Russian industry. There will also be significant associated skill transfers in terms of quality management, energy efficiency and environmental performance from the strategic investor.

The transition impact of the additional project (op id 41626) starting in 2010 is as follows:

Deepening the demonstration effect of new replicable behaviour and activities of a major Russian steel company: Severstal will serve as an example of restructuring in the Russian steel sector. Co-operation with leading global companies is an important element in Severstal’s business strategy. Outsourcing more than 50% of Severstal’s needs in industrial gases to Air Liquide – a leading global supplier of air separation technology, processes and services - will further promote this process and serve as an example to other major Russian steel producers.

The additional project will further promote sustainable energy investments in Russian industries and is expected to lead to further energy efficiency improvements and carbon emission reduction.

The Client

ZAO Air Liquide Severstal Joint Venture set up by Air Liquide SA (75%) and OAO Severstal (25%).

Air Liquide SA is a leading international industrial gases supplier and OAO Severstal is a major Russian integrated steel and rolled products producer.

EBRD Finance

Up to €72 million senior long term loan comprising of A-Loan of up to €36 million, B-Loan of up to €36 million syndicated to the commercial banks.

Additional project (op id 41626) in 2010: up to €15 million senior long term loan.

Project Cost

€103 million.

Additional project in 2010: €47 million.

Environmental Impact

Environmental classification and rationale

The project is categorised B. The construction of an air separation plant is associated with a number of site specific issues, which can be readily identified, assessed and mitigated through measures as defined in the Environmental and Social Action Plan.

Key environmental issues and mitigation

Environmental issues associated with the operation of an oxygen plant are not significant, notably as this will be a new installation constructed within the existing steel plant complex, employing state-of-the-art technology. The plant will be operated in accordance to Air Liquide’s environmental best practices, which are based on EU environmental standards and requirements. The location is entirely within the current boundary of the Severstal facility and no extension to any Sanitary Protection Zone is required. Noise and vibration, which are normally associated with such plants, will be mitigated at the design stage and given the installations location will not affect the background levels. All cooling water will be recycled. Waste oil will be the only liquid effluent and this will be handled at Severstal’s oil regeneration facilities. These measures are aimed to ensure that the environmental issues will be sufficiently managed to prevent or minimise impacts on staff and local population as well as on the environment.

Given that the plant will rely on the operation of the Severstal steel plant, a top level review of the steel plant was also undertaken. The steel plant has generally been meeting all local and regional environmental standards and is in compliance with Russian regulations. The plant has implemented an environmental management system and has been certified according to ISO 14001.

Environmental opportunities

The project will allow for significant environmental opportunities, mainly through energy efficiency at the steel plant. The new installation will replace old unit that was characterised by low efficiency. The new plant will allow for energy saving of about 4.8MW and also benefit from the existing project through CO2 emissions reduction of up to estimated 100,000 tons of CO2 over the next several years. The new installation will be part of an overall modernization program at Severstal.

Summary of Environmental Action Plan

The Company will be required to adhere to Russian and EU environmental, health and safety regulations and standards. All relevant permits will need to be obtained during the construction period and prior to commissioning the plant. As all environmental protection measures have been incorporated in the project structure, there is no need for a stand alone Environmental Action Plan.

Disclosure of information and consultation

In the context of the EBRD’s participation in the project, the Company will release locally a summary of relevant environmental issues associated with the project and summarise mitigation measures, action plans and other initiatives agreed.

Monitoring and reporting

The Company will monitor the environmental impact of its operations in accordance with national law and regulations. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports prepared for the project covering:

(i) ongoing performance of project-specific environmental, health and safety activities as reflected in the results of periodic and quantitative sampling and measuring programmes, and

(ii) the status of implementation of environmental mitigation and improvement measures. The Bank’s representatives will also conduct periodic site supervision visits when deemed appropriate.


The additional project is categorised B (2008). The issues associated with this additional project are site specific and can be managed and/or mitigated through measures as defined in the Environmental and Social Action Plan (ESAP) being drafted for the implementation and operation of the Project works. Environmental issues associated with the operation of an oxygen plant are not significant, notably as this will be a new installation constructed within the existing steel plant complex, employing state-of-the-art technology. The plant will be operated in accordance to Air Liquide’s environmental best practices, which are based on EU environmental standards and requirements. Monitoring of the client’s environmental and health and safety management performance on an existing plant subject to EBRD funding (DTM 35545) shows that the client has the capability of managing operations to the Bank’s Performance Requirements.

The location of the additional project is also entirely within the current boundary of the Severstal facility and no extension to any Sanitary Protection Zone is required. The Company is committed to maintaining compliance with the permitting and operational requirements that apply in Russia.

Technical Cooperation

None.

Company Contact

Victor Budygin, CFO, Air Liquide Russia

Voronsovskaya str. 17, Moscow

109147, Russia, Moscow, Voronsovskaya str. 17

Tel: +7 495 641 2898; Fax: +7 495 641 2891

Email: info.moscow@airliquide.com

Business opportunities

For business opportunities or procurement, contact the client company.

 

Business opportunities

For business opportunities or procurement, contact the client company.

For state-sector projects, visit EBRD Procurement: Tel: +44 20 7338 6794
Email: procurement@ebrd.com

General enquiries

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168
Email: projectenquiries@ebrd.com

Public Information Policy (PIP)

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations. Please visit the Public Information Policy page below to find out how to request a Public Sector Board Report.
Text of the PIP

Independent Project Accountability Mechanism (IPAM)

If efforts to address environmental, social or public disclosure concerns with the Client or the Bank are unsuccessful (e.g. through the Client’s Project-level grievance mechanism or through direct engagement with Bank management), individuals and organisations may seek to address their concerns through the EBRD’s Independent Project Accountability Mechanism (IPAM).

IPAM independently reviews Project issues that are believed to have caused (or to be likely to cause) harm. The purpose of the Mechanism is: to support dialogue between Project stakeholders to resolve environmental, social and public disclosure issues; to determine whether the Bank has complied with its Environmental and Social Policy or Project-specific provisions of its Access to Information Policy; and where applicable, to address any existing non-compliance with these policies, while preventing future non-compliance by the Bank.

Please visit the Independent Project Accountability Mechanism webpage to find out how to submit a Request for review through our confidential online form, by email, mail or telephone. IPAM is available to discuss your concerns and answer any questions you may have about the submission or handling of Requests, which follow the Project Accountability Policy and Guidance. Requestors’ identities may be kept confidential, upon request.