UKRAINE RAILWAYS: FAST PASSENGER TRAINS PROJECT

Location:

Ukraine

Project number:

14849

Business sector:

Transport

Notice type:

Public

Environmental category:

B

Target board date:

22 Jun 2004

Status:

Repaying

PSD disclosed:

04 Feb 2003

Project Description

The proposed project will provide further assistance in operational modernisation of Ukraine Railways (“Ukrzaliznytsia“ or “UZ”), and enhance institutional strengthening of UZ through assistance with developing a new corporate structure. The Project objectives are to: (i) replace old-style night sleeper services on medium distance inter-city routes with fast day passenger services which will provide much better service to customers and a higher return to UZ; (ii) eliminate a critical bottleneck on the pan-European corridor V with the construction of the Beskyd Tunnel; (iii) continue with the track rehabilitation programme that commenced with the proceeds of the first loan.

Transition Impact

Transition impact would stem from: (i) UZ conversion into a joint-stock company; (ii) new legislation and introduction of amendments to existing legislation to allow UZ’s corporatisation process; (iii) implementation of UZ’s Railway Reform Policy; (iv) introduction of efficient procurement methods for equipment and rolling stock purchase.

The Client

Ukrzaliznytsia (or “UZ”) which is 100% owned by the State. UZ's Director General is also the Minister of Transport.

EBRD Finance

The Bank would extend a loan of US$ 120 million to UZ to finance (i) the purchase of passenger carriages; (ii) the purchase of track machinery; (iii) the construction of the Beskyd tunnel and (iv) consultancy services.

Project Cost

Total project cost is US$ 289 million including local contributions and estimated taxes and duties to be paid by the borrower (EUR 289 million).

Environmental Impact

Classified IEE, requiring an Initial Environmental Examination (IEE). Each of the three sub-projects will need to undergo an individual environmental due diligence. Two of these: the purchase of new passenger carriages and modern track machinery; have been classified B/0 requiring an environmental analysis. Due to the limited information currently available on the third sub-project, the construction of a new double track Beskyd tunnel an IEE will be carried out to determine the Bank's environmental due diligence requirements. In case IEE identifies sensitive environmental issues, this sub-project may be classified "A", requiring a full environmental impact assessment and public consultation as per Ukrainian law and the Bank's policies and procedures. A summary environmental analysis of each of the sub-projects will be annexed to this document as soon as the environmental investigations have been completed.

Technical Cooperation

Technical Co-operation funding will include:
Beskyd Tunnel Feasibility Study – engineering assessment of the proposed investment and preparation of ToR for geological survey, financed by Austrian bilateral funds – EUR 60,000 (in completion);
Project preparation - geological survey to serve as basis for later tunnel design and construction of the Beskyd tunnel, expected to be financed by bilateral grant funds – estimated EUR 200,000;
Institutional strengthening and implementation – drafting new legislation to allow corporatisation and implementation of Railway Reform Policy, environmental measures, expected to be financed by EU-TACIS – estimated EUR 800,000.
 

Business opportunities

For business opportunities or procurement, contact the client company.

For state-sector projects, visit EBRD Procurement: Tel: +44 20 7338 6794
Email: procurement@ebrd.com

General enquiries

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168
Email: projectenquiries@ebrd.com

Public Information Policy (PIP)

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations. Please visit the Public Information Policy page below to find out how to request a Public Sector Board Report.
Text of the PIP

Project Complaint Mechanism (PCM)

The Project Complaint Mechanism (PCM) is the EBRD's accountability mechanism. It provides an opportunity for an independent review of complaints from individuals and organisations concerning EBRD-financed projects which are alleged to have caused, or are likely to cause, environmental and/or social harm.

Please visit the Project Complaint Mechanism page to find information about how to submit a complaint. The PCM Officer (pcm@ebrd.com) is available to answer any questions you may have regarding the submission of a complaint and criteria for registration and eligibility, in accordance with the PCM Rules of Procedure.