Severtar

Location:

Russia

Project number:

42991

Business sector:

Manufacturing and Services

Notice type:

Private

Environmental category:

B

Target board date:

17 Apr 2012

Status:

Complete

PSD disclosed:

03 Nov 2011

Translated version of this PSD: Russian
 

Project Description

The EBRD is considering a USD 25 mn financing to the JV of Ruetgers of Germany and Severstal of Russia for the construction and operation of a new coal tar distillation facility on the premises of Severstal’s Metallurgical Plant in Cherepovets, Russian Federation. Ruetgers will provide managerial and technical know-how to the JV and Severstal will ensure a long-term supply of coal tar to the new facility. The project replicates a successful on-site co-operation model applied by Severstal in projects with other partners that were financed by the EBRD.

Transition Impact

Application of best industry practices through the outsourcing model in the commercialisation of a by-product in the steel production. The project may also have the potential to set standards in terms of environmental management if the new facility for tar distillation meets EU BAT standards.

The proposed project will introduce the advanced technology of Ruetgers for coal tar distillation, providing a high-profile model for the transfer of modern technology and know-how into a major Russian industry. There will also be significant associated skill transfers in terms of quality management, energy efficiency and environmental performance from the strategic investor.

The Client

OOO Rütgers Severtar, a JV between Ruetgers GmbH and OAO Severstal. Ruetgers is one of the world’s largest coal tar distillers. Severstal is Russia’s largest steel maker.

EBRD Finance

USD 25 mn, including USD 10 mn to be syndicated to commercial banks.

Project Cost

USD 40 million.

Environmental Impact

Environmental classification and rationale

The project is categorised B. The refurbishment and reconstruction of a tar distillation plant is associated with a number of site specific issues, which can be readily identified, assessed and mitigated through measures as defined in the Environmental and Social Action Plan.

Key environmental issues and mitigation

Due diligence has been carried out on the Company operations by means of a site visit and discussions with management around policies, procedures and performance against environmental and health and safety regulations; and the corporate activities undertaken with regard to stakeholder engagement. Additionally, recent environmental site assessments carried out by international consultant's were reviewed and assessed.

The German JV Partner plans to introduce plant and processes that are aligned with their operations throughout the EU and therefore the refurbished plant will meet both Russian and EU requirements in terms of environmental performance. Additionally, it is proposed that environmental and health and safety management systems accredited to international standards be implemented specifically for the JV operations.

Certain areas were identified that require to be addressed to bring the operations into compliance with the Bank’s Environmental and Social Performance Requirements (PRs) and these issues have been addressed via the drafting of an Environmental and Social Action Plan (ESAP) which has been being agreed with the Company.

Summary of Environmental Action Plan

The Company will be required to adhere to the Bank’s PRs. Specific actions include confirmation of the implementation of an Environmental Management System in line with the requirements of ISO 14001; the drafting of a Stakeholder Engagement Plan in line with the Bank’s PR10; and the implementation of a Contractor Management Plan to ensure that the actions of contractor’s meet the requirements of the various management plans outlined above and the Bank’s PRs.

Monitoring and reporting

The Company will monitor the environmental impact of its operations in accordance with national law and regulations. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports prepared for the project.

Technical Cooperation

None.

Company Contact

Poul Jorgensen, General Director
OOO Ruetgers Severtar
Mira street 30
162608, Cherepovets
Russian Federation

 

Business opportunities

For business opportunities or procurement, contact the client company.

For state-sector projects, visit EBRD Procurement: Tel: +44 20 7338 6794
Email: procurement@ebrd.com

General enquiries

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168
Email: projectenquiries@ebrd.com

Public Information Policy (PIP)

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations. Please visit the Public Information Policy page below to find out how to request a Public Sector Board Report.
Text of the PIP

Project Complaint Mechanism (PCM)

The Project Complaint Mechanism (PCM) is the EBRD's accountability mechanism. It provides an opportunity for an independent review of complaints from individuals and organisations concerning EBRD-financed projects which are alleged to have caused, or are likely to cause, environmental and/or social harm.

Please visit the Project Complaint Mechanism page to find information about how to submit a complaint. The PCM Officer (pcm@ebrd.com) is available to answer any questions you may have regarding the submission of a complaint and criteria for registration and eligibility, in accordance with the PCM Rules of Procedure.