Power Distribution Reconstruction Project

Location:

Bosnia and Herzegovina

Project number:

35806

Business sector:

Power and energy

Notice type:

Public

Environmental category:

B

Approval date:

29 Nov 2005

Status:

Repaying

PSD disclosed:

18 Sep 2005

Project Description

The proposed project is aiming at modernising the electricity distribution systems of three regional utilities in Bosnia & Herzegovina, enabling the three local power utilities (or “Electroprivredas”) to improve the reliability of electricity supply and to increase energy efficiency by minimising losses of electricity. The Borrower, the State of BiH will on-lend to the three Electroprivredas that will implement the project on their own territories. Bank’s funding will be used for the supply and installation of new metering equipment, protective cables and for the rehabilitation of substations.

Transition Impact

The Project will directly support the electricity sector restructuring in Bosnia & Herzegovina by improving its financial and technical performances in particular in the field of electricity distribution paving the way to the future privatisation of these activities.

Improvement of the efficiency and reduction of losses will have a substantial impact on the performances of the distribution sector making it commercially viable and attractive in the future for investors. The standardisation of equipment achieved through a common purchasing policy implemented through the project for the three Electroprivredas will reduce the maintenance cost while streamlining the management and operation of the sector.

 

The Client

The State of Bosnia & Herzegovina will on-lend the proceeds of the Bank’s loan to the three state-owned regional power utilities: Elektroprivreda Hrvatske Zajednice Herceg-Bosne ( “EP Mostar” or “EPHZHB”), Elektroprivreda Republike Srpske (“EPRS”), and Elektroprivreda Bosne i Hercegovine (“EPBiH”).

EBRD Finance

The Bank will lend EUR 50 million to the State; this amount will be equally split among the three regional power utilities.

Project Cost

The total project cost is 60 million Euros including taxes and custom duties.

Environmental Impact

Screened B/1.

The project is likely to improve the safety and environmental standards of the distribution systems as well as increase energy efficiency by minimising losses of electricity. The existing facilities will need to undergo an Environmental Audit to identify and assess any contamination of soil with transformer oil, potentially containing PCB. The environmental monitoring of the previous projects has shown that the current environmental and health and safety management of the three regional power utilities requires strengthening. The due diligence will need to review the status of the implementation of existing Environmental Action Plans as covenanted in the loan agreements with the Bank and define measures for supporting the environmental management of the three regional power utilities. No other environmental issues to raise at this stage.

Technical Cooperation

Technical Cooperation funding in excess of 100,000 Euros was provided by the Greek Government for supporting the project preparation and due diligence.

 

Business opportunities

For business opportunities or procurement, contact the client company.

For state-sector projects, visit EBRD Procurement: Tel: +44 20 7338 6794
Email: procurement@ebrd.com

General enquiries

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168
Email: projectenquiries@ebrd.com

Public Information Policy (PIP)

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations. Please visit the Public Information Policy page below to find out how to request a Public Sector Board Report.
Text of the PIP

Share this page: