Albania Power Sector Reconstruction

Location:

Albania

Project number:

8345

Business sector:

Power and energy

Notice type:

Public

Environmental category:

B

Target board date:

16 Nov 1999

Status:

Completed

PSD disclosed:

18 Oct 1999

Project Description

Modernisation of main hydro plants and transmission and distribution networks in Albania.

The project aims to:

  • provide sufficient electriity supply for the domestic markets by reducing commercial and technical losses;
  • achieve a 30 MW increase in generating hydro capacity; and
  • enhance the reliability and quality of electricity supply and reduce power cuts in the country.

Transition Impact

The project is expected to:

  • restore reliable supply of electricity in the region;
  • re-establish regional cross support; and
  • enhance KESH management skills.

 

By increasing the availability and reliability of power supply in Albania, the project will directly contribute to:

  • the mitigation of instability risks in the region; and
  • the recovery and future economic development of Albania.

The Client

Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptare (KESH).

EBRD Finance

The EBRD has signed a loan of EUR 30 million to KESH.

Project Cost

EUR 60 million.

Environmental Impact

The project concerns the modernisation of two hydro power plants and the construction or improvement of transmission and distribution lines. The project replaces two existing modern-isation projects for which environmental due diligence studies were carried out, including an environmental impact assessment for a transmission line. Public consultation was also carried out for the previous projects. New project components (for example, a transmission line) will comply with relevant EU and international standards, and issues identified during environmental due diligence (e.g. PCB analysis of transformer oil) have either already been addressed or will be addressed as part of this new project. The project is expected to have an overall positive environmental impact by helping to replace polluting thermal power stations with hydro-power capacity and also by reducing transmission line losses.

Technical Cooperation

None.

 

Business opportunities

For business opportunities or procurement, contact the client company.

For state-sector projects, visit EBRD Procurement: Tel: +44 20 7338 6794
Email: procurement@ebrd.com

General enquiries

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168
Email: projectenquiries@ebrd.com

Public Information Policy (PIP)

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations. Please visit the Public Information Policy page below to find out how to request a Public Sector Board Report.
Text of the PIP

Project Complaint Mechanism (PCM)

The Project Complaint Mechanism (PCM) is the EBRD's accountability mechanism. It provides an opportunity for an independent review of complaints from individuals and organisations concerning EBRD-financed projects which are alleged to have caused, or are likely to cause, environmental and/or social harm.

Please visit the Project Complaint Mechanism page to find information about how to submit a complaint. The PCM Officer (pcm@ebrd.com) is available to answer any questions you may have regarding the submission of a complaint and criteria for registration and eligibility, in accordance with the PCM Rules of Procedure.