Project description
A loan for the construction, commissioning and operation of 81.4 MWe wind power project located in north-western Poland (the "Project"). This is an extention of a Bank funded Project (DTM 47932), approved Phase 1 and 2 of the same Project. The Project has been categorized A category due to cumulative impacts.
The Project has been developed by by Energix Polska Sp.z.o.o, (the “Developer”). The Project will contribute to climate mitigation by increasing the share of renewable energy generation in Poland and add 81.4 MW wind generation capacity to the national energy system. In addition, the Project will strengthen the private sector's role in the renewable energy sector in Poland.
ESIA disclosure for Phase 1 and Phase 2 of the Project
ESIA disclosure package
1. Non-Technical Summary (NTS)
2. Stakeholder Engagement Plan
3. Draft Environmental and Social Action Plan (ESAP)
4. ESIA Supplemental Study
5. Environmental Impact Assessment
6. Environmental Permit
Download entire package in in Zip format
The documents are also available on the Energix web site
The Company is developing another wind farm (Zelchowo) in the near vicinity and has disclosed the local EIA and NTS for this project.
NTS for Zelchowo Wind farm: Polish | English
Full EIA for Zelechow
Full ESIA availability
Full ESIA documentation is available locally at:
Energix Polska Sp. Z o.o.
Plac Stanisława Małachowskiego 2
00-066 Warszawa
Contact: Magdalena Sankowska, Office Manager, email: magdalenas@energix-group.com, tel. +48 514 482 156
And
Banie commune
Urząd Gminy Banie, ul. Skośna 6, 74-110 Banie, (tel.) +48 91 41 66 381, urzad@banie.pl
Major Arkadiusz Augustyniak (tel.) +48 91 41 66 381, wojt@banie.pl
And
Widuchowa commune
Urząd Gminy Widuchowa, Grunwaldzka 8, 74-120 Widuchowa, (tel.) +48 91 41 67 255, org@widuchowa.pl
Major Paweł Wróbel, (tel.) +48 606 363 632
Enquiries
Environmental or social enquiries
Magdalena Sankowska,
email: magdalenas@energix-group.com,
tel. +48 514 482 156;
Energix Polska Sp. z o.o. Plac Stanisława Małachowskiego 2; 00-066 Warsaw
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014