Project description
A senior loan of up to EUR 150 million in favour of DCT Gdansk (“DCT” or the “Company”) and its 100% holding Baltic Hub (“HoldCo”), both incorporated in Poland. EBRD loan will be part of a wider debt package of up to EUR 863.5 million provided jointly with commercial banks to i) refinance the Company's existing debt, ii) capex for construction of Terminal 3, and iii) provide working capital for the Company. EBRD’s loan will be focused on capex facility and will contribute to funding construction of Terminal 3, upgrade and renewal of the equipment on Terminals 1 and 2 and additional yard development.
ESIA disclosure package
In English and Polish
1. National EIA
2. Critical Habitat Assessment
3. Ornithology Mitigation Review
4. Marine Mammal Mitigation Review
5. Assessment of impacts on marine environment related to capital dredging
6. Stogi beach morphology and water quality
7. Social Baseline and Assessment
8. Stakeholder Engagement Plan
9. Environmental and Social Action Plan
10.Non-Technical Summary
Download English package in zip format
Download Polish package in zip format
Full ESIA availability
Full ESIA documentation is available locally at:
T3 Development Unit
DCT Gdansk SA, 7 Kontenerowa Street, 80-601 Gdansk, Poland
and
Documentation T3 - Terminal Kontenerowy DCT (dctgdansk.pl)
Dokumentacja T3 - Terminal Kontenerowy DCT (dctgdansk.pl)
Enquiries
Environmental or social enquiries
DCT Gdansk Sp. z o.o.
ul. Kontenerowa 7
80-601 Gdańsk, Poland
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014