Project description
The provision of finance of up to USD 240 million in local currency split into two tranches under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The first tranche in the amount equivalent to USD 187.4 million in local currency will finance the reconstruction of a 204 km long road section between the cities of Kyzylorda and Zhezkazgan. The second uncommitted tranche of USD 52.6 million will finance construction of a 14.8 km bypass around Kyzylorda, adjacent to the motorway.
The proposed investments include construction of the a greenfield 14.8 km bypass around Kyzylorda, which the EBRD has assigned it a Category A, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days.
ESIA disclosure package
1. Environmental and Social Impact Assessment in English and Russian (July 2021)
2. Non-Technical Summary (NTS) in English and Russian (July 2021)
3. Stakeholder Engagement Plan (SEP) in English and Russian (July 2021)
4. Environmental and Social Action Plan (ESAP) in English and Russian (July 2021)
5. Environmental and Social Management Plan (ESMP) in English and Russian (July 2021)
Full ESIA availability
Full ESIA documentation is available locally at:
Garyshzhan Nagmanov, Manager of the first category of Loan Management,
JSC KazAutoZhol
Phone: +7-701-055-06-55
Nur-Sultan, Kunayev Str. 10, Emerald Towers Business Centre, 34 floor
Email: garyshzhan.nagmanov@qaj.kz
And
EBRD Resident Office in Nur-Sultan
2, Dostyk street
Saad Business Centre
010000 Nur-Sultan
Kazakhstan
Tel. +7 7172 554246
Fax.: +7 7172 554245
E-mail: AstanaRO@ebrd.com
And
Website
Enquiries
Environmental or social enquiries
Garyshzhan Nagmanov, Manager of the first category of Loan Management,
JSC KazAutoZhol
Phone: +7-701-055-06-55
Nur-Sultan, Kunayev Str. 10, Emerald Towers Business Centre, 34 floor
Email: garyshzhan.nagmanov@qaj.kz
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014