Confirm cookie choices
Cookies are pieces of code used to track website usage and give audiences the best possible experience.
Use the buttons to confirm whether you agree with default cookie settings when using ebrd.com.

MR3: Al Ghabawi Septic Tank Facility

Location:

Jordan

Project number:

49875

Business sector:

Municipal and environmental infrastructure

Notice type:

Public

ESIA disclosed:

19 Nov 2020

Status:

Signed

Approval date:

27 Oct 2021

Project description

Provision of a sovereign loan for the construction of a new wastewater facility for the disposal of septic tank effluent.

ESIA disclosure package

1. Non-Technical Summary (NTS)
2. Stakeholder Engagement Plan
3. Environmental and Social Action Plan (ESAP)
4. Environmental and Social Impact Assessment (ESIA)

Download documents in English and Arabic (Zip format)

Al Ghabawi Septic Tank Facility Project SEP : English | Arabic

Full ESIA availability

Full ESIA documentation is available locally at:

Water Authority of Jordan
Building No. 6, Jaber Ben Hayyan Street, Shmeisani - Amman
Telephone: +962-6-5652261

Uhud District Municipal Directorate / GAM:
Al-Khashafieh North District / opposite to Al- Khashafieh Health Center
Tel: +962-6-4020410

EBRD Resident Office in Jordan
Emmar Towers, 196 Zahran Street, 15th Floor
P.O. Box 852805
Amman 11185
Jordan

Enquiries

Environmental or social enquiries

Water Authority of Jordan
Attention. Eng. Ahmad Al-Awamleh
Building No. 6, Jaber Ben Hayyan Street, Shmeisani
P.O. Box 5012, Amman-11181
Telephone: +961 6-5652261 – Extension (1050)
Fax: +961 6-5687760
Email:  ahmad_al-awamleh@mwi.gov.jo
Web: www.mwi.gov.jo

General enquiries

Contact Name:  Eng. Sultan Mashaqbah
Email:  Sultan_Mashaqbah@mwi.gov.jo
Web: www.mwi.gov.jo

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.

Last updated 25 June 2014

GDPR Cookie Status