Project description
Provision of a loan for the construction, commissioning and operation of a new 1.5 GW combined cycle gas turbine power plant in the Syrdarya region of the Republic of Uzbekistan (the “Project”). The Project is part of an ongoing modernisation of the power generation sector in Uzbekistan aimed at increasing efficiency and reducing environmental impacts.
ESIA disclosure package
- Non-technical summary (ESIA, Vol 1)
- Environmental & Social Impact Assessment (ESIA, Vol 2)
- Framework for Environmental & Social Management (ESIA, Vol 3)
- ESIA Appendices (ESIA, Vol 4)
- Environmental and Social Action Plan
- Livelihood Restoration Framework
- Stakeholder Engagement Plan
Download English versions in Zip format
Download Russian versions in Zip format
Download Uzbek versions in Zip format
Full ESIA availability
https://www.acwapower.com/en/projects/sirdarya-ccgt/
Sherzod K. Onarkulov
International Business Center Block-A, 13th Floor 107-B, Amir Temur Avenue Tashkent, 100084, Uzbekistan
T + 998 71 238 9960 M + 998 90 003 9960
And
Alkis Vryenios Drakinos
Tashkent Resident Office
European Bank For Reconstruction and Development
13th floor, Banking Association of Uzbekistan
1,Qoratosh Street, Tashkent, 100027
Uzbekistan
Tel.: +998781404400
Enquiries
Environmental and social enquiries
Bernardo Del Castillo
BDelCastillo@acwapower.com
Hicham El Maanouni
helmaanouni@acwapower.com
T: +971 278 3001
General enquiries
Tom Teerlynck
TTeerlynck@acwapower.com
Hicham El Maanouni
helmaanouni@acwapower.com, T: +971 278 3001
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014