Project description
Provision of a senior long-term loan to finance the development, construction and operation of the 121 MW Debsk wind farm in northern Poland (the "project"). The project has been developed by Polenergia Farma Wiatrowa 3 Sp. z o.o. ("Developer"). Construction works are expected to be completed in 2021.
The loan is to be made available to Polenergia Farma Wiatrowa 3 Sp. z o. o. (the "borrower"), established to develop, construct and operate the Debsk wind farm. The borrower is owned by Polenergia S.A. (the "sponsor").
ESIA disclosure package
National EIA, Supplementary Report, Supplementary 2019 Biodiversity Annex, Supplementary acoustic 2019 Annex, NTS, SEP, ESAP
Download a zip file of the package in English
Download a zip file of the package in Polish
Full ESIA availability
Full ESIA documentation is available locally at:
Urząd Gminy w Kuczborku-Osadzie
Ul. Mickiewicza 7A
09-310 Kuczbork
Pan Andrzej Koper (pokój 8)
Urząd Gminy w Żurominie
Plac Józefa Piłsudskiego 3
09-300 Żuromin
Aleksandra Wnuk (pokój 25)
And
EBRD Resident Office in Warsaw
53 Emilii Plater Street
Warsaw Financial Center
Suite 1300
00-113 Warsaw
Tel: +48 22 520 5700, Contact person Katarzyna Kurbiel - Auleytner
Documents are also available at the Sponsors website (www.polenergia.pl) under the following links:
https://www.polenergia.pl/pol/pl/strona/%5Btitle-raw%5D-16 (Polish)
https://www.polenergia.pl/pol/en/page/%5Btitle-raw%5D-7 (English)
Enquiries
Environmental or social enquiries
Marta Porzuczek, Dyrektor Departamentu Ochrony Środowiska i Zrównoważonego Rozwoju
Polenergia SA
Ul. Krucza 24/26, 00-526 Warszawa
Numer telefonu: +48 22 522 38 42
Tłum .: + 48 609 909 702
e-mail: Marta.Porzuczek@polenergia.pl
General enquiries
Lukasz Golaszewski
lukasz.golaszewski@polenergia.pl
tel: +48 22 522 39 00
www.polenergia.pl
Polenergia SA ul. Krucza 24/26 00-526 Warszawa
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014