Confirm cookie choices
Cookies are pieces of code used to track website usage and give audiences the best possible experience.
Use the buttons to confirm whether you agree with default cookie settings when using ebrd.com.

Black Sea Oil and Gas

Location:

Romania

Project number:

48811

Business sector:

Natural resources

Notice type:

Private

ESIA disclosed:

18 Apr 2019

Status:

Disbursing

Approval date:

18 Oct 2017

Project description

The Midia Gas Development Project (MGD Project) comprises the Ana and Doina gas fields located some 120 km offshore Romania in the XV Midia Shallow area.

MGD Project consists of 5 production wells (1 subsea well at Doina field and 4 platform wells at Ana field) a subsea gas production system over the Doina well which will be connected through an 18 km pipeline with a new unmanned production platform located over Ana field. A 121 km subsea pipeline will ensure the delivery of the gas from Ana platform to the shore, where a 4.1 km underground pipeline will connect to the new gas treatment plant.

Additional information can be found on the Black Sea Oil & Gas website.

ESIA disclosure package

Full ESIA availability

Full ESIA documentation is available locally at:

Black Sea Oil & Gas SRL
175 Calea Floreasca, 10th floor,
district #1, 014459,
Bucharest, Romania,
phone +40 21 231 32 56
e-mail: office@blackseaog.com

And

European Bank for Reconstruction and Development
District 1, 89-97 Grigore Alexandrescu Street,
Metropolis Centre, West Wing, 3rd Floor
Bucharest

Iustin Ivanescu
Phone:0040 21 202 71 00

And

RO
EN

Enquiries

Environmental or social enquiries

Ms. Ana-Maria Pericleanu
Telephone: +40 21 231 32 56
E-mail: ana-maria.pericleanu@blackseaog.com
or office@blackseaog.com

 

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.

Last updated 25 June 2014

GDPR Cookie Status