Project description
Provision of a loan for the construction, commissioning and operation of a 252 MW windfarm operating 96 wind turbines and located in the Gulf of Suez, approximately 30km North-West of Ras Ghareb in Egypt.
A Project Summary document is available for this project.
ESIA disclosure package
Non-Technical Summary (NTS): English | Arabic
Updated Non-Technical Summary (NTS): English | Arabic
Draft Environmental and Social Action Plan (ESAP): English | Arabic
Final Environmental and Social Action Plan (ESAP): English | Arabic
- ESIA for Lekela BOO Wind Power Plant at Gulf of Suez (2018): English | Arabic
- Scoped – B ESIA for OTL and Transformer Substation - Gulf of Suez (2018): English | Arabic
- Lekela North Ras Gharib 250 MW: Critical Habitat Assessment: English | Arabic
- Lekela North Ras Gharib 250 MW: Analysis of cumulative effects to biodiversity: English | Arabic
- Lekela North Ras Gharib 250 MW: Analysis of cumulative effects to biodiversity - Updated (May 2019): English
- BOO Egypt Wind Project: Environmental and Social Management System Policy Manual: English | Arabic
- Gulf of Suez BOO Wind Power Plant Project: Supplementary Social Baseline and Assessment: English | Arabic
- Stakeholder Engagement Plan: English | Arabic
- Community feedback procedure: English | Arabic
The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE is available. The final proposal for a 5-year bird monitoring program for an area of 797 km2 in the Gulf of Suez is also available.
Updated documentation to reflect a change in wind turbine design and layout:
Full ESIA availability
Full ESIA documentation is available locally at:
-
The Local Unit for the City of Ras Gharib City Council, El-Mina Street – Ras Gharib Egypt
And
-
EBRD Resident Office in Cairo
-
EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo, Egypt
And
https://lekela.com/projects/egypt-gulf-of-suez-2/
Enquiries
Environmental or social enquiries
- Contact Name: Jennifer Boca, Head of ESG
- Email: Jennifer.Boca@lekela.com
General enquiries
- Contact Name: Chad Canfield
- Email: Chad.Canfield@lekela.com
- Web: http://lekela.com/
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014