Project description
Provision of a senior secured loan of up to EUR 50 million to Electrawinds K-Wind d.o.o. to finance the construction, commissioning and operation of the 104.5MW Kovacica wind farm consisting of 38 wind turbines each with capacity of 2.75 MW and including a 220/33-35 KV substation (the "Project") located 50km northeast of Belgrade, Serbia.
A Project Summary Document is available for this project.
ESIA disclosure package
Environmental and Social Impact Assessment (ESIA): English | Serbian
Non-Technical Summary (NTS): English | Serbian
Stakeholder Engagement Plan (SEP): English | Serbian
Environmental and Social Action Plan (ESAP): English | Serbian
Full ESIA availability
Full ESIA documentation is available locally at:
Milos Colic
Electrawinds K-Winds
Djordja Stanojevica 14, Belgrade, Serbia
And
EBRD Belgrade
Blue Centre
Spanskih boraca 3
11070 Belgrade
Serbia
Contact name: Iva Raslapcevic, e-mail: iva.raslapcevic@ebrd.com, telephone:+381 11 20 98 927
Enquiries
Environmental or social enquiries:
Milos Colic
Electrawinds K-Winds
Djordja Stanojevica 14, Belgrade, Serbia
tel. +381 11 7853 704
e-mail milos.colic@newenergy.rs
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014