Project description
The Project involves the construction of a large dam on the Nenskra River with a height of 130 m and a reservoir of up to 3 km2 and the construction of 280MW Hydropower Plant (HPP). The hydropower scheme is located in Samegrelo-Zemo Svaneti region, on the territory of Mestia Municipality.
The Project is developed by JSC Nenskra, a special purpose vehicle (“SPV”) established in Georgia for the sole purpose of constructing the 280 MW JSC Nenskra Hydro (the “Project”). At financial close the SPV will be majority owned by Korea Water Resources Corporation (“K-water”), a State-owned company registered in South Korea, with a participation of 10% by Partnership Fund (“PF”), a state-owned company registered in Georgia. More information can be found on the JSC Nenskra website.
ESIA disclosure package
NTS: English | Georgian
Stakeholder Engagement Plan: English | Georgian
ESMP: English | Georgian
LALRP: English | Georgian
SIA: English | Georgian
Full ESIA availability
Full ESIA documentation is available locally at:
Nenskra HPP Office in Tbilisi: 6 Marjanishvili , floor 4
Irina Petriashvili 555 25 32 72
Nenskra Information Centers: Chuberi Center and Nakra:
Magradze Ana 598 42 12 02
Ansiani Giori 574 90 00 66
Gvarmiani Rodami 599 85 55 43
And
EBRD
Loretta Maritkian
Tel: +995 32 244 74 00
Fax: +995 32 292 05 12
Merani Business Center
31a Griboedov Street, 6th Floor
0108 Tbilisi, Georgia
During the active consultation period, the Client has disclosed the ESIA package on the following website.
General enquiries
Environmental and social enquiries
Social Manager
6 Marjanishvili street, floor 4, Tbilisi Georgia
Email: info@nenskrahydro.ge
Website: www.nenskra.com
Tel: 0 322 430 421 from Georgia
+995 322 430 421 from Oversea
General enquiries
Communication Officer
6 Marjanishvili street, floor 4, Tbilisi Georgia
Email: info@nenskrahydro.ge
Website: www.nenskra.com
Tel: 0 322 430 421 from Georgia
+995 322 430 421 from Oversea
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014