Purpose of the Environmental and Social Impact Assessments
The proposed project is for the urgent rehabilitation of the Gazela Bridge and approach roads, which is the main bridge in the City of Belgrade and forms an integral part of Trans European Corridor X, and construction of the remaining sections of the Belgrade bypass, which is required to alleviate traffic congestion in the City.
There is a project summary document available for this project.
ESIA Summary
Executive summary (English) (177KB - PDF)
Full ESIA availability
Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com
And
PE "Roads of Serbia", 11000 Belgrade, Bul. Kralja Aleksandra 282 Belgrade. Tel: +381 30 40 734; Fax: +381 30 40 614. Contact: Igor Radovic, Environmental Specialist, E-mail. radovici@dzp.co.yu
And
EBRD Resident Office in Belgrade: Bulevar AVNOJ-a 64 A, 5th. Floor, 11070 Novi BELGRADE. (tel: +381 11 212 0529) Contact: Aleksandar Mihajlovic.
Enquiries
Environmental enquiries
Igor Radovic
PE "Roads of Serbia",
Email: radovici@dzp.co.yu
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014