Ekoenergia(Alchevsk Iron&Steel Works Cogeneration Facility)

Location:

Ukraine

Project number:

36625

Business sector:

Notice type:

Private

ESIA disclosed:

20 Jul 2006

Status:

Complete

Approval date:

05 Dec 2006

Purpose of the Environmental and Social Impact Assessments

The proposed project consists of the construction of a new 300 MWe Combined Cycle Gas Turbine (“CCGT”) power plant located within the existing Alchevsk Iron & Steel Works facility (“AMK”). This plant will consist of two units, each comprising of a gas turbine, heat recovery and steam generators, steam turbine and electricity generators. The new CCGT plant will be located within the existing steel plant and, after the planned wider modernization of the steel plant, will utilise process off-gases from the coke ovens, converters, and blast furnaces. Natural gas will not be required for routine operation of the CCGT plant. The plant will utilize waste gases, which otherwise would have to be flared, thereby reducing the environmental impact of the plant. The construction of the CCGT is to be initiated in 2007 and is expected to be completed in 2009. The CCGT will be designed to meet all Ukrainian and EU environmental standards, inclusive of European Union Integrated Pollution, Prevention and Control (“IPPC”) and Large Combustion Plant Directive (“LCDP”) requirements. It should be noted that the CCGT development is just one element of a major wide ranging environmental improvement programme access the steelworks site as a whole, partially funded by among other the International Finance Corporation (“IFC”). The intention of these improvements is to provide significant environmental benefits, particularly with respect to air quality.

ESIA Summary

Executive summary (English) (531KB - PDF)

Executive summary (Russian) (665KB - PDF)

Public disclosure and consultation plan (English) (251KB - PDF)

Public disclosure and consultation plan (Russian) (361KB - PDF)

Full ESIA availability

Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com

And

Alchevsk Iron & Steel Works AMK Environmental Department
4 Schmidt Str, Alchevsk;
tel. +38 6442 933 25
Contact: Mr Nickolaj Antonv; e-mail: dikovich@amk.lg.ua

And
EBRD Resident Office Kiev,
27/23 Sofiyska Street
01001 Kiev, Ukraine
Fax: +38 044 2706813
Tel: +380 44 270 6132
Contact: Olga Yeriomina
email: yeriomio@kev.ebrd.com

And
http://www.amk.al.lg.ua

And

Enquiries

Environmental enquiries:

Mr Nickolaj Antonv

AMK Environmental Department

Alchevsk Iron & Steel Works
4 Schmidt Str,
Alchevsk,
94202, Lugansk region,
Ukraine;
 

Tel. +38 6442 933 25;
Fax: 380 (06442) 9-33-76
e-mail: dikovich@amk.lg.ua

General enquiries:

Mr Sergei Yelizarov
Consortium "Industrial Group"
14b, Yaroslaviv Val Street
Kyiv, 01034,
Ukraine

Tel: + 380 (44) 591 64 13
Fax: + 380 (44) 591 64 55

General e-mail: abrosimov@amk.lg.ua or
Email: syelizarov@c-ig.com

 

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.