Purpose of the Environmental and Social Impact Assessments
The proposed project consists of construction of a new 750 kV power transmission line. This public sector project involves the construction and operation of two new transmission lines: the 750 kV Rivne NPP – Kyiv transmission line of the total length 353 km and the 135 km 750 kV Khmelnytsk NPP - Chernobyl NPP line diversion to Kyiv substation. The line and the diversion will be constructed along new routes and as part of the assessment a number of alternative routes were considered. The objective of this project is to increase the reliability of power supply to consumers in Kiev region and improve the overall stability of the grid system. Increased reliability of the power system will increase overall sector efficiency will thus have indirect environmental benefits and facilitate international co-operation in the sector.
The proposed project consists of
i) construction of two new 750 kV power transmission lines: the 750 kV “Rivne NPP – Kyiv substation” transmission line of the total length 353 km (Lot 1) and the 135 km 750 kV “Khmelnytsk NPP - Chernobyl NPP line diversion to Kyiv substation” (Lot 2)
ii) expansion of Kyiv substation capacity through the installation of a second 1000MVA autotransformer (Lot 3), and
iii) construction of 60km of 330kV double circuit line from Kyiv substation to Kyiv city transmission network (Lot 4, to be financed by EIB). The lines and the diversion will be constructed along new routes and as part of the assessment a number of alternative routes were considered. The objective of this public sector project is to increase the reliability of power supply to consumers in Kiev region and improve the overall stability of the grid system. Increased reliability of the power system will increase overall sector efficiency will thus have indirect environmental benefits and facilitate international co-operation in the sector.
There is a project summary document available for this project.
ESIA Summary
June 2013 ESIA Scoping (Lots 3 and 4)
Installation of second АТ at SS 750 kV Kievska and construction of 330 kV diversions to SS 750 kV Kievska” (Lots 3 & 4 of Rivne-Kyiv HVL Project).
Scoping report and the Stakeholder Engagement Plan in English and Ukrainian.
Full ESIA report, Non-Technical Summary and Stakeholder Engagement Plan documents in English and in Ukrainian.
(Lots 1 and 2)
ESIA Executive Summary (English) (4MB - PDF)
ESIA Executive Summary (Ukrainian (5MB - PDF)
Full ESIA availability
(Lots 1 and 2)
Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com
And
Larysa Vorobei
Ukrenergo office
Kyiv 25
Kominiterna Street
Room 25
Tel: 38 044 238 30 44
Fax: 38 044 249 18 47 email: Snezhko@nec.energy.gov.ua
And
EBRD Resident Office Kiev ,
27/23 Sofiyvska Street
Tel: + 380 44 270 61 32
Contact Olga Yeriomina
Email: yerimino@kev.ebrd.com
And
http://www.ukrenergo.energy.gov.ua
And
Rivne region
Matchuk V.Y.
Head of Administration
Rivne State Regional Administration,
Town of Rivne, Prosvita Sq., 1
tel. +380362247487
Borovets А.P.
Head
Rokytne State District Administration,
Township of Rokynte,
Nezaleznosti Str., 13
tel. +380363522090
Bobryk О.О.
Head of Administration
Volodymyrets State District Administration
Township of Volodymyrets, Grushevskiy Str., 56
tel. +380363423300
Bagniy V.S.
Head of Administration
Sarny State District Administration,
Town of Sarny,
Radyanska Str., 51
tel. +380365532320
Korovkin V.О.
Head
Kuznetsovsk Town Council
Town of Kuznetsovsk,
Maidan Nezalezhnosti Str., 1,
tel. +380363621818
Zhytomyr region
Pavlenko Y.O.
Head of Administration
Zhytomyr State Regional Administration,
Town of Zhytomyr, Rad Sq., 1
tel. +380412372114
Chernykh V.S.
First Deputy Head of Administration
Olevsk State District Administration,
Town of Olevsk, Svyatomykolaivska Str., 4
tel. +380413521857
Pavlenko А.А.
Head of Administration
Radomyshl State District Administration,
Town of Radomyshl,
Sobornyi Sq., 12
tel. +380413242167
Chenkov М.М.
Head of Administration
Chernyakiv State District Administration,
Town of Chernyakhiv,
Radyanska Sq., 1
tel. +380413421697
Lisovyi P.S.
Head of Administration
Yemilchyne State District Administration,
Township of Yemilchyne, Lenina Str.,18
tel. +380414942436
Braton О.G.
Head of Administration
Korostyshiv State District Administration,
Town of Korostyshiv,
Cervona Sq., 18
tel. +380413036283
Adamovych P.О.
Head of Administration
Volodar-Volynsk State District Administration,
Township of Volodar-Volynsk,
Karl Marks Str., 6
tel. +3804124531245
Linevych V.V.
Deputy Head
Chervonoarmiysk State District Administration
Town of Chervonoarmiysk, Lenina Str., 123,
tel. +380413131614
Kiev region
Ulyanchenko V.І.
Head of Administration
Kyiv State Regional Administration,
City of Kyiv, Lesya Ukrainka Sq., 1
tel. +380442868230
Zabela Y.V.
Head of Administration
Makariv State District Administration,
Township of Makariv,
Frunze Str., 30
tel. +3827851444
Enquiries
Larysa Vorobei
Deputy Head of Investment Project Design Department
Ukrenergo
Tel: 38 044 238 30 44
Fax: 38 044 249 18 47
email: oks1@nec.energy.gov.ua
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014