Confirm cookie choices
Cookies are pieces of code used to track website usage and give audiences the best possible experience.
Use the buttons to confirm whether you agree with default cookie settings when using ebrd.com.

Banja Luka to Doboj Road

Location:

Bosnia and Herzegovina

Project number:

41370

Business sector:

Transport

Notice type:

Public

ESIA disclosed:

17 Jun 2011

Status:

Signed

Approval date:

04 Oct 2017

Purpose of the Environmental and Social Impact Assessments

The EBRD is considering providing a loan of up to EUR 70 million for construction of the 37.8 kilometre long Prnjavor – Doboj motorway section, which is part of the total 76 kilometre motorway from Banja Luka to Doboj.

The objective of the Project is to construct part of the Banja Luka to Doboj road which is the key regional link in Republika Srpska that runs parallel to Corridor X in Croatia and connects to Croatia in the north through Gradiska and at the eastern section, at Doboj to Corridor Vc which is Bosnia and Herzegovina’s (‘BiH’) strategic north-south corridor.

The broad transitional theme is to encourage the participation of the private sector through support for development of the Public-Private-Partnership scheme.

There is a project summary document available for this project.

ESIA Summary

Non-Technical Summary (English) (2MB - PDF)

Non-Technical Summary (Serbian) (1MB - PDF)

The ‘Disclosure Package’ for the Project includes the following documents:

  • EIS Final Study: Banja Luka to Doboj Motorway: January 2011 (& Annexes) (Serbian and English)
  • Preliminary EIA: Banja Luka to Doboj Motorway: Book 5 : General Design CIP 2005 (Serbian and English)
  • Route Alignment Report: Banja Luka to Doboj Motorway: Book 1 Vol. 4 General Design CIP 2005 (Serbian and English)
  • Decision on the Approval of the EIS: Banja Luka to Doboj Motorway: (Decision No. 15-96-135/10) (Serbian and English)
  • Non-Technical Summary Prnjavor to Doboj Motorway (June 2011) (Serbian and English)
  • Environmental & Social Action Plan (ESAP) (June 2011) (Serbian and English)
  • Stakeholder Engagement Plan (SEP) (June 2011) including grievance mechanism (Serbian and English)

English versions are available at the following website:

Serbian versions are available at the following sites:

Full ESIA availability

Full ESIA documentation is available locally at:

EBRD Headquarters in London, environmentandsocial@ebrd.com

And

Full ESIA documentation is available locally at:

Republika Srpska Motorways

Veselina Masleše 22, 78 000, Banja Luka

Tel: ++387 51 233 670

e-mail: ngajic@autoputevirs.com

www.autoputevirs.com

 

MUNICIPALITY PRNJAVOR

Karađorđrva 2

78 430 Prnjavor

Tel: ++387 51 663 740

http://www.opstinaprnjavor.net/

MUNICIPALITY DERVENTA
Trg oslobođenja 3,
74 400 Derventa
Tel: +387 53 315 106

www.derventa.ba

MUNICIPALITY DOBOJ
Hilandarska 1,
74 000 Doboj
Tel: +387 53 242 022

www.opstina-doboj.ba

MUNICIPALITY LAKTAŠI
Karađorđeva 56
78 250 Laktaši

Tel: +387 51 334 200

www.laktasi.net

And

EBRD Bosnia and Herzegovina Resident Office

15th Floor, Tower B
Unitic Towers
Fra Andela Zvizdovica 1
71000 Sarajevo
Bosnia & Herzegovina
Tel: +387 33 667 945, 946, 947
Fax: +387 33 667 950

 

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.

Last updated 25 June 2014

GDPR Cookie Status