Purpose of the Environmental and Social Impact Assessments
The EBRD is considering providing a loan of up to EUR 70 million for construction of the 37.8 kilometre long Prnjavor – Doboj motorway section, which is part of the total 76 kilometre motorway from Banja Luka to Doboj.
The objective of the Project is to construct part of the Banja Luka to Doboj road which is the key regional link in Republika Srpska that runs parallel to Corridor X in Croatia and connects to Croatia in the north through Gradiska and at the eastern section, at Doboj to Corridor Vc which is Bosnia and Herzegovina’s (‘BiH’) strategic north-south corridor.
The broad transitional theme is to encourage the participation of the private sector through support for development of the Public-Private-Partnership scheme.
There is a project summary document available for this project.
ESIA Summary
Non-Technical Summary (English) (2MB - PDF)
Non-Technical Summary (Serbian) (1MB - PDF)
The ‘Disclosure Package’ for the Project includes the following documents:
- EIS Final Study: Banja Luka to Doboj Motorway: January 2011 (& Annexes) (Serbian and English)
- Preliminary EIA: Banja Luka to Doboj Motorway: Book 5 : General Design CIP 2005 (Serbian and English)
- Route Alignment Report: Banja Luka to Doboj Motorway: Book 1 Vol. 4 General Design CIP 2005 (Serbian and English)
- Decision on the Approval of the EIS: Banja Luka to Doboj Motorway: (Decision No. 15-96-135/10) (Serbian and English)
- Non-Technical Summary Prnjavor to Doboj Motorway (June 2011) (Serbian and English)
- Environmental & Social Action Plan (ESAP) (June 2011) (Serbian and English)
- Stakeholder Engagement Plan (SEP) (June 2011) including grievance mechanism (Serbian and English)
English versions are available at the following website:
- http://www.autoputevirs.com/aprs/Doc.aspx?cat=2&subcat=59&lang=eng&id=81&br=0
- http://www.autoputevirs.com/Upload/dokumenti/15_6_2011_19_Decision%20on%20the%20approval%20of%20EIS,%20engl.pdf
Serbian versions are available at the following sites:
- http://www.autoputevirs.com/aprs/Doc.aspx?cat=2&subcat=59&lang=cir&id=81&br=0
- http://www.autoputevirs.com/Upload/dokumenti/15_6_2011_4_Odluka%20o%20odobravanju%20Studije%20uticaja%20autoputa%20BL_Doboj,%20lokalni.pdf
Full ESIA availability
Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com
And
Full ESIA documentation is available locally at:
Republika Srpska Motorways
Veselina Masleše 22, 78 000, Banja Luka
Tel: ++387 51 233 670
e-mail: ngajic@autoputevirs.com
MUNICIPALITY PRNJAVOR
Karađorđrva 2
78 430 Prnjavor
Tel: ++387 51 663 740
http://www.opstinaprnjavor.net/
MUNICIPALITY DERVENTA
Trg oslobođenja 3,
74 400 Derventa
Tel: +387 53 315 106
MUNICIPALITY DOBOJ
Hilandarska 1,
74 000 Doboj
Tel: +387 53 242 022
MUNICIPALITY LAKTAŠI
Karađorđeva 56
78 250 Laktaši
Tel: +387 51 334 200
And
EBRD Bosnia and Herzegovina Resident Office
15th Floor, Tower B
Unitic Towers
Fra Andela Zvizdovica 1
71000 Sarajevo
Bosnia & Herzegovina
Tel: +387 33 667 945, 946, 947
Fax: +387 33 667 950
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014