Kirikkale CCGT

Location:

Turkey

Project number:

42896

Business sector:

Notice type:

Private

ESIA disclosed:

04 Oct 2011

Status:

Repaying

Approval date:

02 Oct 2012

Purpose of the Environmental and Social Impact Assessments

The EBRD approved a senior loan to Acwa Güç Elektrik Işletme ve Yönetim Sanayi ve Ticaret A.Ş. (“Acwa Guc” or the “Company”) for the development of a Greenfield 800MW independent power plant (the “Project”) to be structured on a merchant basis and located 50km east of Ankara, near the city of Kirikkale, Turkey.

In 2014, due to changes to the Project structure and to design, a new site was identified and located 1 km from the original site. The updated designs are for a 928MW CCGT, using the same technology. Due to the change in design and location a new ESIA has been developed.

The new plants is a state -of-the-art large CCGT gas fired power plant fully complying with best international practice, National legislation as well as EU environemntal standards.

There is a project summary document available for this project.

ESIA Summary

The updated ESIA disclosure for both the power line and the associated transmission line is available on the Company web site.

It includes the following documents available in English and Turkish:

Stakeholder Engagement Plan (SEP)
English (1MB - PDF) Turkish (1MB - PDF)

SEP Appendixes
English (8MB - PDF) Turkish (7MB - PDF)

For the Power Plant

Non-technical Summary (NTS)
English (1MB - PDF) Turkish (2MB - PDF)

Environmental and Social Management and Monitoring Plan
English (463KB - PDF) Turkish (547KB - PDF)

For the Overhead Transmission Line

Non-technical Summary (NTS)
English (2MB - PDF) Turkish (2MB - PDF)

Environmental and Social Management and Monitoring Plan
English (476KB - PDF) Turkish (590KB - PDF)

Full ESIA availability

Full ESIA documentation is available locally at:

  • Mr. Soner Yildiz, Sr Business Development Manager,
    Tesvikiye Caddesi
    Tesvikiye Palas No:23 -2
    Nisantasi 34365 Istanbul, Turkey

    Tel: + 90 212 259 3396
    Fax: + 90 212 259 3397
    Email: SYildiz@acwapower.com
  • In Kırıkkale Provincial Directorate of Environmental and Urban Planning; -Kaletepe Mahallesi Samsun Bulvarı; Ulutaş Apartmanı No:151 Kırıkkale
  • Web site
  • EBRD, Resident Office Istanbul, Buyukdere Caddesi, 185; Kanyon Ofis Binasi, Kat: 2; Levent; Istanbul 34394; Turkey; Email: RO-Istanbul@ebrd.com; Tel: +90 212 386 1100; Contact Andi Aranitasi ; email: AranitaA@ebrd.com

The ESIA package and Executive Summary have also been released for public review by the project sponsor on its web site.

The executive summary is available on the EBRD web site.

Enquiries

Environmental enquiries:

Acwa Power Contact;
Mr. Soner Yildiz, Sr Business Development Manager,
Tesvikiye Caddesi
Tesvikiye Palas No:23 -2
Nisantasi 34365 Istanbul, Turkey

Tel: + 90 212 259 3396
Fax: + 90 212 259 3397
Email: SYildiz@acwapower.com

 

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.

Last updated 25 June 2014

GDPR Cookie Status