Purpose of the Environmental and Social Impact Assessments
The EBRD is considering a project involving the construction and operation of cement plant and limestone quarry in Urgun, in the Dornogobi Province, Mongolia. This will involve the construction of a 53.3km of overhead power line, a 10km below ground water pipeline, a road network, railway extension and workers accommodation. Construction is expected to start in March 2013 and continue for a period of 12 months.
There is a project summary document available for this project.
ESIA Summary
Categorised A, requiring a full Environmental and Social Impact Assessment (ESIA) in accordance with the Bank’s Environmental and Social Policy.
An Environmental and Social Impact Assessment (ESIA) has been prepared to meet national standards. This is supplemented by Environmental and Social (E&S) report, which includes additional information on the local hydrogeology and environmental and social impacts associated with groundwater use, given that water use is sensitive in this part of Mongolia. Other supporting documents include a Stakeholder Engagement Plan (SEP), a Non-Technical Summary (NTS), Land Acquisition Framework (LAF) and an Environmental and Social Action Plan (ESAP) can be downloaded.
Enclosed are:
Non Technical Summary (NTS): English (2MB - PDF) Mongolian (1MB - PDF)
Stakeholder Engagement Plan (SEP): English (588KB - PDF) Mongolian (644KB - PDF)
Environmental and Social Action Plan (ESAP): English (176KB - PDF) Mongolian (416KB - PDF)
Full ESIA availability
Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com
And
Senj Sant LLC, Urgun Site Office
Contact: Site Manager: Boldbayar Luntan
Email: boldbayar@monpolymet.mn
Tel: +(976) 99905725
Senj Sant LLC, Ulaanbaatar Office
Tengeriin Tsag Centre,
Olympic Street – 14
Ulaanbaatar
Mongolia
Phone. + (976) 11 311 633
Contact: Ms. Khaliun Tserenpil
Project Assistant
Email: khaliun@monpolymet.mn
Sainshand Governor's office
Governor: B. Batbayar
fax: 01522-22440
mobile: 93019955
Dornogobi, Mongolia
Urgun Soum Governor's office
Governor: S.Purevkhuu
fax: 025248-4052
mobile: 99041769
Dornogobi, Mongolia
And
EBRD Resident Office, Ulaanbaatar
Philip ter Woort, Head of Office
3rd Floor
MCS Plaza
Seoul Street – 4
Ulaanbaatar 210644
Mongolia
Tel: + 976 11 317 974
Fax: + 976 11 315 844
And
Enquiries
Ms. Khaliun Tserenpil
Project Assistant, Senj Sant LLC
Email: khaliun@monpolymet.mn
Telephone: 99220792
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014