Purpose of the Environmental and Social Impact Assessments
The EBRD is considering providing a Polish Zloty long-term loan of up to €68 million equivalent to finance the construction and operation of a 120MW greenfield Pawlowo wind farm in north-west Poland. The Project is being developed in two phases: Phase I of 79.5MW located in the municipality of Gołańcz to be completed in 2013 and Phase II of 40.5MW located in the municipality of Budzyń to become operational in 2015. The Project will assist Poland in increasing its renewable energy capacity to meet EU’s green energy quotas.
There is a project summary document available for this project.
ESIA Summary
NTS: English (4MB - PDF) Polish (4MB - PDF)
SEP: English (417KB - PDF) Polish (505KB - PDF)
Supplementary Report and ESAP: English (231KB - PDF) Polish (292KB - PDF)
Full ESIA availability
Full ESIA documentation is available locally at:
EBRD Headquarters in London, environmentandsocial@ebrd.com
Full EIA documentation is available locally at:
1. Sponsor’s Local office
EDP Renewables Polska Sp z o.o
Postępu 17B Street
Adgar Plaza Building
02-676 Warsaw
Poland
Tel (48) 223310188 Ext. 40114
Fax: (48) 223109732
Contact:
Ms. Barbara Sidoruk
e-mail: Barbara.Sidoruk@edpr.com
or
Ms. Paulina Szuliga-Piętka
email : Paulina.Szuliga-Pietka@edpr.com
2. Local community
- Urzad Miasta i Gminy Margonin; ul. Kosciuszki 13; 64-830 Margonin; tel. fax (+48) 672846068
- Urzad Miasta i Gminy Gołancz; ul. dr. Piotra Kowalika 2; 62-130 Gołancz; tel. (+48) 672615911;
- Urzad Gminy Budzyn; ul. Lipowa 6; 64-840 budzyn; tel. (+48) 672843201
3. EBRD Resident Office in Warsaw
ul. Emillii Platter 52
Tel: 48 (22) 520 58 26
Contact: Mr Grzegorz Zielinski
email: zielinskg@ebrd.com
Enquiries
Ms. Barbara Sidoruk or Ms. Paulina Szuliga-Piętka
Environmental Specialist
ENVIRONMENT
Postępu 17b Street
Adgar Plaza Building
02-676, Warsaw, Poland
Phone: (48) 331 01 88 Ext. 40114
e-mail: Barbara.Sidoruk@edpr.com
or Paulina.Szuliga-Pietka@edpr.com
or Mediation Officer during the construction works at Pawłowo-Gołancz wind farm:
Mr. Karol Rybicki
CONSTRUCTION & ENGINEERING,
Postępu 17b Street
Adgar Plaza Building
02-676, Warsaw, Poland
Phone: (48) 331 01 88
e-mail: Karol.Rybicki@edpr.com
or during operation of the Pawłowo-Golancz wind farm:
Mr Sebastian Januchowski
OPERATION & MAINTANANCE
Wind Farm Manager Pawłowo – Gołańcz
GPZ w miejscowości Rybowo
e-mail: Sebastian.Januchowski@edpr.com
General Enquiries
Postępu 17b Street
Adgar Plaza Building
02-676, Warsaw, Poland
Phone: (48) 331 01 88
e-mail: pytania@edpr.com
The ESIA package has also been released for public review by the project sponsor on the project website. This is available under Pawlowo or other subsections. The web sites also includes the Margonin ESIA documentation.
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014