Purpose of the Environmental and Social Impact Assessments
The EBRD is considering providing a senior loan to Enerjisa Enerji Üretim A.Ş. (the "Company” or “Enerjisa”) for the development and construction of the greenfield Alpaslan II dam and Hydro Electric Power Plant (Alpaslan II HPP) located on the Murat River, a tributary of the Euphrates River, in the Mus Province, in the Eastern Anatolian region of Turkey (Alpaslan II or the Project). Alpaslan II will have an installed capacity of 280 MW and is expected to be operational by Q2 2017.
There is a project summary document available for this project.
ESIA Summary
Non-Technical Summary: English (7MB - PDF) Turkish (7MB - PDF)
SEP: English (4MB - PDF) Turkish (3MB - PDF)
ESAP: English (140KB - PDF) Turkish (376KB - PDF)
Full ESIA availability
The ESIA has also been released locally in the following locations:
Enerjisa Project office
Mus-Varto Karayolu
40 km Dumlusu Koyu Mevkii
Tel: +90 436 711 33 03
Enerjisa Head Office
Ceyhun Atıf Kansu Cad.
No:106 Kat:8 Balgat Ankara
Tel: +90 312 583 40 00
Fax: +90 212 385 89 73
State Hydraulic Works (DSI)
XVII. Regional Directorate 172.
Branch Elazıg Yolu Uzeri Merkez/Mus
Village Mukhtars of:
Dumlusu Village/Mus, Tepeköy Village/Mus, Bagiçi Village/Mus, Kayalıdere Village/Mus, Sanlıca Village/Mus, Aligedik Village/Mus
Muş Municipality Offices
Minare Mah. Merkez-Mus
Varto District Governor’s Office- Mus
Jandarma Sok. Hükümet Konagı Varto-Mus
Special Provincial Administration- Mus
Karayolları Kavsağı Bitlis Yolu Uzeri Merkez-Mus
The Project ESIA will also be available at the following EBRD offices:
EBRD, Resident Office Istanbul, Buyukdere Caddesi, 185; Kanyon Ofis Binasi, Kat: 2; Levent; Istanbul 34394; Turkey; Email: RO-Istanbul@ebrd.com; Tel: +90 212 386 1100
Enquiries
Murat Yagcı – Community Relations Officer
Enerjisa Enerji Uretim A.S.
Tel: +90 436 711 33 03
Mobile: +90 530 016 48 12
Email: murat.yagci@enerjisa.com
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.
Last updated 25 June 2014