EFELER GPP

Country:

Turkey

Project number:

44596

Business sector:

Power and energy

Notice type:

Private

ESIA disclosed:

23 Sep 2014

Status:

Signed

Target board date:

06 May 2015

Purpose of the Environmental and Social Impact Assessments

The EBRD is considering providing a senior loan to Gurmat Elektrik Uretim A.S. (“Gurmat Elektrik” or the “Company”) for the development of a greenfield 123.3MW geothermal power plant (GPP) located in the Aydin-Germencik province, 110 km south west of Izmir in Turkey. The Gürmat 2 Geothermal Power Plan will consist of four power generating units as well as the associated boreholes, pipelines and transmission lines.

Guris Holding (“Guris”) is a large, Turkish company with interests in the construction, energy generation, and industrial sectors (www.gurisholding.com). The Project will help Guris to expand its renewable energy portfolio and allow for the development of renewable energy in Turkey. The Gürmat 2 Geothermal Power Plant has been developed in line with Turkish legislation and an Environmental Impact Assessment (EIA) has been completed as part of the local compliance process.

Gurmat has been operating an existing 47.4 MWe geothermal power plant (“Gürmat 1”) to the north east of Germencik since 2009. Although this is not part of the Project the ESIA has taken into consideration cumulative impacts and experience of preparing this plant to date.

There is a project summary document available for this project.

ESIA Summary

Environmental Impact Assessment – EIA

Non-Technical Summary (NTS) of the Project: Turkish ; English

Stakeholder Engagement Plan (SEP); Turkish and English

Social Impact Assessment (SIA): Turkish and English

EIA Addendum; Turkish and English

Environmental and Social Action Plan (ESAP); Turkish and English

Full ESIA availability

Full ESIA documentation is available locally at:

  • Gürmat Head Office

Karaoglanmah. KaraoglanKumeevleri No: 739 Golbasi 06830 Ankara Turkey

Telephone number: +90 (312) 484 05 70

Fax: +90 (312) 484 45 70

  • Gürmat Omerbeyli Field

Omerbeyli KoyuMevkii, Germencik, Aydin, Turkey

Telephone number: +90 (256) 563 33 25

Fax: +90 (256) 563 35 11

Е-mail: info@gurmat.com.tr

Web-site: http://www.mogan.com.tr/

Buyukdere Caddesi, 185;

Kanyon Ofis Binasi, Kat: 2; Levent; Istanbul 34394;

Turkey; Email: RO-Istanbul@ebrd.com;

Tel: +90 212 386 1100;

Contact Andi Aranitasi ; email: AranitaA@ebrd.com

  • EBRD Business Information Centre, London; One Exchange Square; London, EC2A 2JN; United Kingdom; Tel: +44 207 338 6000

The ESIA package and Executive Summary have also been released for public review by the project sponsor on its website www.mogan.com.tr

The executive summary is available on the EBRD internet sites at www.ebrd.com/eia

Enquiries

General enquiries:

Contact: Mr Mert Cilingir

Tel: +90 312 484 0570

Email: mcilingir@guris.com.tr

Karaoglanmah. Karaoglan Kumeevleri No: 739

Golbasi 06830 Ankara

Turkey

Telephone number: +90 (312) 484 05 70

Fax: +90 (312) 484 45 70

 

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental and Social Impact Assessments and ESIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental and Social Impact Assessment or the ESIA Summary do not necessarily reflect the views or opinions of the EBRD.

Last updated 25 June 2014