Project summary document

Project name:Lomonosov District Heating
Country:Russia
Project number:40511
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:7 December 2010
Status:Passed concept review, Pending final review
Date PSD disclosed:
Date PSD updated:
16 June 2009
Local language translation:Перевод на русский 
Date translation disclosed:2 July 2009
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Municipal and environmental infrastructure homepage

Project description
and objectives:

The EBRD is considering financing of construction, rehabilitation, upgrade of boilers and distribution network (pipes) in the Lomonosov municipal district (the “Municipality”) within the Leningrad region. The priority investments to be financed by EBRD will be defined by consultants in a feasibility study.

Transition impact:

Transition impact is expected to be achieved through:

  • Introduction of transition related performance indicators, to be identified during due diligence;
  • Skills and knowledge transfer during the Corporate Development Support Programme and training for the Project Implementation Unit;
  • Cost restructuring (demonstration effect);
  • Introduction of a service agreement to further commercialise the operations of the Operating Company;
  • Development and implementation of an Environmental and Social Action Plan (ESAP) which will significantly improve the Operating Company’s environmental management and overall performance.

 

The client:

  • “LR TEK” LLC (the Operating Company), providing water, wastewater and district heating services to both residential and industrial customers in the Lomonosov municipal district within the Leningrad region and wholly owned by the Municipality

  • “LEK” Jsc (the Company), holding water, wastewater and district heating assets operated and leased by the Operating Company and wholly owned by the Municipality;

 

EBRD finance:

Senior loan of up to RUB 900 million (equivalent to ca EUR 20 million) to the Operating Company, backed by a financial guarantee from the Company and the Municipality. The loan is proposed to be co-financed by a capital grant from the Northern Dimension Environmental Partnership (“NDEP”).

Total project cost:

Up to RUB 1 495 million.

Environmental impact:

Screened B (2008) requiring an environmental and social analysis of the proposed investment and an environmental, health and safety audit of the existing operations and facilities of the Company. Initial screening identified that the following Performance Requirements are applicable to the Project:

PR 1 – Environmental & Social Appraisal & Management

The boundaries of the project include existing district heating plants and distribution network owned by the Company as well as goods and services supplied in relation to the proposed project.

PR 2 – Labour & Working Conditions

Key issues might include the availability of adequate working conditions and health and safety hazards control measures for operational personnel. Potential presence of asbestos in the insulation material might pose an occupational health risk during decommissioning of old boilers and pipes. An asbestos survey would need to be conducted and appropriate procedures for asbestos, if found to be present, removal and handling developed and adhered to by contractors. The due diligence will also identify that the Company has and adequate grievance procedure.

PR 3 – Pollution Prevention & Abatement

Construction phase might be associated with the disposal of construction waste, increased noise and dust levels. Current activities of the Company might be associated with the handling and disposal of waste, wastewater treatment and discharge and general housekeeping.

PR 4 – Community Health, Safety & Security

Replacement of pipes might entail some safety risks related to availability of proper fencing; temporary passage plates over the trenches; and lighting of temporary construction sites at night. Another issue could be a potential damage to water pipes and other underground facilities during removal of old pipes. The due diligence shall identify if the Company has in place a procedure for an advance notification of planned activities as well as sign-posting of temporary construction sites.

PR 10 – Information Disclosure & Stakeholder Engagement

Stakeholders of the Project include direct consumers of district heating supplied by the Company; any communities that might be affected by replacement of pipes; NGOs and regulators. An external communication programme of the Company will need to ensure that there is an ongoing communication to members of public on environmental, social, health and safety issues that might affect them.
An environmental and social due diligence of the Project will need to be completed and An Environmental and Social Action Plan developed and agreed with the Client prior to the Final Review of the Project.

Technical
cooperation:

Grant funds will be sought for:

  • Technical Feasibility Study to assist the Operating Company with preparation of a feasibility study for the project, which will focus on the priority investment programme;

  • Project Implementation Support including establishment and training of PIU and its staff, engineering, design and procurement support and contracts supervision;

  • Corporate Development Support Programme.

 

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Alexander Rogachevsky, Operation Leader: rogachea@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com

Public Information
Policy (PIP):

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.
Text of the PIP

Independent Recourse
Mechanism (IRM):

The EBRD has established the IRM to give local groups that may be directly and adversely affected by a Bank project a means of raising complaints or grievances with the Bank, independently from banking operations.
Guidelines for Making a complaint and the Rules of procedures


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback