EBRD homepage
About the EBRD
News & events
Publications
Countries & topics
Projects
 
Project summaries

Approved & signed

Case studies

Environmental documents

Evaluation
Apply for financing
Environment
Capital markets
EBRD blog
Working together
 

 

Project summary document

Project name:RSECF - Russian Sustainable Energy & Carbon Finance Facility
Country:Russia
Project number:37857
Business sector:Lending to banks
Public/Private:Private
Environmental category:FI
Board date:3 June 2009
Status:Board approved
Date PSD disclosed:
Date PSD updated:
1 April 2009
Local language translation:Перевод на русский 
Date translation disclosed:20 April 2009
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Lending to banks homepage

Project description
and objectives:

The EBRD is considering a EUR 300 million framework facility under which the EBRD would extend credit lines to Participating Banks (PBs) for on-lending to private sector companies for sustainable energy projects in the industrial sector. It is envisaged that 6-7 Russian banks will be PBs under the framework. Discussions are currently taking place with potential participants.

Sub-projects:

  • Promsvyazbank - RSECF Energy Efficiency Loan

Transition impact:

The project is expected to transfer and build expertise, among both banks and companies, related to energy efficiency and carbon finance. The banks will develop expertise in assessing the risk and creditworthiness of clients for energy efficiency loans, while the enterprises are expected to become more familiar with bank requirements for providing energy efficiency loans and carbon finance process. The project is expected to have two sources of transition impact:

i) demonstration of the benefits of rational energy usage;
ii) transfer of skills (to the PBs and sub-borrowers)

The client:

The clients will be Russian banks which will on-lend the funds to primarily industrial sub-borrowers planning to undertake sustainable energy investments in the private sector.

EBRD finance:

Senior loans of up to an aggregate of EUR 300 million to be allocated to PBs in Russian Federation.

Total project cost:

EUR 300 million from EBRD.

Environmental impact:

FI screened operation. This project will contribute to improved efficiency in the use of heat and energy and will lead to a reduction of air pollutants (e.g., SO2; NOx; CO2; particulates), including released during industrial production. PBs will require that companies financed through framework comply with national requirements for environment, health and safety. This will be confirmed to the PBs by the consultant who will cover this issue as part of assessment of each project (see Technical co-operation section below for more information). Reporting on sub-projects and annual monitoring reports will be provided by PBs.

Technical
cooperation:

It is expected that the TC assignment will be funded by the EBRD Shareholder Special Fund and by Germany's Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). Project Consultant will be contracted by the Bank to cover the following scope of TC:

a. provide overall project coordination
b. provide initial training to PBs, including training on carbon financing
c. proactively work with PBs in reviewing their client base and identify a pipeline of potential projects
d. promote the Facility through marketing campaigns
e. identify individual opportunities through a dedicated energy audit (“EA”) comprising site visits, energy performance assessment, cost-benefit analysis of technically feasible investments
f. assess compliance of each proposed project or set of projects with applicable environmental and health and safety laws and standards
g. advise on the eligibility of the sub-projects proposed to be financed under the Facility
h. monitor the performance of the Facility and the sub-projects.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

Kiyoshi Nishimura, Senior Banker, Financial Institutions Team
EBRD, One Exchange Square, London EC2A 2JN
Tel. +44 (0)20 7338 7409
Fax: +44 (0)20 7338 6119
E-mail: NishimuK@EBRD.com

EBRD contact:

Yelena Tonna, Operation Leader: tonnay@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com

Public Information
Policy (PIP):

The PIP sets out how the EBRD discloses information and consults with its stakeholders so as to promote better awareness and understanding of its strategies, policies and operations.
Text of the PIP

Independent Recourse
Mechanism (IRM):

The EBRD has established the IRM to give local groups that may be directly and adversely affected by a Bank project a means of raising complaints or grievances with the Bank, independently from banking operations.
Guidelines for Making a complaint and the Rules of procedures


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback