EBRD homepage
About the EBRD
News & events
Publications
Countries & topics
Projects
 
Project summaries

Approved & signed

Case studies

Environmental documents

Evaluation
Apply for financing
Environment
Capital markets
EBRD blog
Working together
 

 

Project summary document

Project name:Surgut Waste Water Collection and Rehabilitation Project
Country:Russia
Project number:39651
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:16 December 2008
Status:Signed
Date PSD disclosed:
Date PSD updated:
17 October 2008
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Municipal and environmental infrastructure homepage
EBRD in 10-year 200 million rouble water loan for Siberian city of Surgut [Press Release]
ЕБРР предоставляет 10-летний кредит на сумму 200 млн рублей для модернизации системы водоотведения города Сургута [Press Release]

Project description
and objectives:

The EBRD is considering providing finance for the renovation of major wastewater collectors in the city of Surgut in order to improve environmental standards.

Transition impact:

Positive impact: This is a follow-up second project with a client that has had a good track record of reform. As several transition challenges have already been addressed (tariff increases, service contract, collection improvements, financial restructuring) in the first engagement with the company (Surgut MSDP), this project is expected to generate transition impact through addressing the remaining challenges, i.e. moving to a meter-based billing system and adoption of a multi-year tariff policy that incorporates capital charges beside the current coverage for operation and maintenance costs.

The client:

Surgut Municipal Unitary Enterprise “GorVodokanal”, a water and wastewater operator owned by the city of Surgut, responsible for provision of water and wastewater services to the city residents.

EBRD finance:

Long term loan facility to the Company of up to RUB 200 million (~ EUR 5.6 million).

Total project cost:

Total project cost: RUB 300 million (~ EUR 8.4 million).

Environmental impact:

Screened B/1. The project involves the rehabilitation and upgrade of the wastewater collectors for the existing Client, and it is expected to further improve operating efficiency and environmental standards on the wastewater collection services in the City of Surgut. The environmental due diligence will review the current status of the existing facilities, and will assess environmental benefits and impacts of the proposed project components. An Environmental & Social Action Plan (ESAP) will be prepared based on the outcomes of the due diligence.

Technical
cooperation:

  • Project Preparation (technical cooperation funds used):

Technical and Environmental due diligence (up to EUR 40,000), financed by the Bank’s own funds;

  • Project Implementation (to be financed by the Client):

Project Implementation Consultant (up to RUB 10 million (~EUR 280 000)).

 

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Eugene Ofrikhter, Operation Leader: ofrikhte@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback