EBRD homepage
About the EBRD
News & events
Publications
Countries & topics
Projects
 
Project summaries

Approved & signed

Case studies

Environmental documents

Evaluation
Apply for financing
Environment
Capital markets
EBRD blog
Working together
 

 

Project summary document

Project name:Surgut Housing Refurbishment Project
Country:Russia
Project number:34413
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:25 July 2006
Status:Signed
Date PSD disclosed:
Date PSD updated:
24 May 2006
20 June 2006
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Municipal and environmental infrastructure homepage
ЕБРР финансирует проект в жилищном секторе Сургута [Press Release]
EBRD funds Siberian municipal housing project [Press Release]
Новые теплые дома для сибиряков [Story]
Warm new homes for Siberians [Story]

Project description
and objectives:

The proposed project would involve loan to the City of Surgut (the City), a municipality in the Khanty-Mansi Autonomous Okrug (the Okrug). The project would focus on pilot programme to refurbish rapidly depreciating municipal and private housing stock. The project would also focus on development of long term municipal housing policy and institutional strengthening of the municipal housing agency to be established in the due course of project implementation.

Transition impact:

The project is likely to have significant demonstration effect as it will establish a foundation for a sustainable municipal housing policy in the city. The transition potential of the operation relates to:

(i) development of a long term sustainable operational approach for the housing refurbishment through an arms length municipal housing company; (ii) development of a long term housing policy and establishment of the arm-length housing development agency to take charge of future housing refurbishment programmes in the City

(ii) encouragement of private sector involvement and competition into provision of housing management and maintenance services. The project will also contribute towards strengthening of corporate governance standards and transparency in housing development agency through introduction of IFRS for financial reporting and regular external audits.

The client:

The municipality of Surgut will be the Borrower.

EBRD finance:

The loan up to RUB 700 million (EUR 20.4 million) to the City.

Total project cost:

RUB 1,344 million (EUR 40 million).

Environmental impact:

A housing project such as this project has specific environmental impacts which, however, can be readily identified and mitigated through adequate measures and application of good international practice. For the above reasons, the EBRD has classified the project B/1 requiring an Environmental Analysis and Audit of the proposed site and associated facilities. 

An environmental analysis of the existing situation and future impact has been carried out as part of the feasibility study by independent consultants funded by the EU. The analysis confirms that there are no significant environmental issues associated with the Project. Further documentation on the project will be reviewed by the Bank in due course.

The review confirms that there are no significant environmental impacts associated with the project and site.  The City will need to ensure that the re-housing process is conducted in accordance with the EBRD’s Environmental Policy requirements. The newly established municipal housing development agency ( MHDA) will be required to supervise private contractors retained for project implementation in terms of compliance with prescribed Russian and EU environmental, health, safety and labour standards during project implementation.

The Project will involve significant social and environmental opportunities: improvements in housing conditions and energy saving through lower demand for heat. 

The Bank will evaluate the project’s compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports (AER) prepared for the project covering: (1) on-going project-specific environmental, health and safety performance including legal compliance, and (ii) the status of implementation of environmental and social mitigation measures.

Technical
cooperation:

Locally financed TC
  • Design, Procurement and other implementation support (up to EUR 2.5 million).
  • Corporate Development Programme for the municipal housing development agency aimed to enhancing its commercial viability and institutional capacity (EUR 400,000).
  • Development of the long term municipal housing policy (EUR 200,000)
Previous Technical Cooperation included:
  • The Feasibility Study for the Project was prepared by Ecorys and financed by the City

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Eugene Ofrikhter, Operation Leader: ofrikhte@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback