Project summary document

Project name:Bosnia and Herzegovina Regional Railway Project
Country:Bosnia and Herzegovina
Project number:35418
Business sector:Transport
Public/Private:Public
Environmental category:B
Board date:15 November 2005
Status:Signed
Date PSD disclosed:
Date PSD updated:
10 March 2005
Help

Subscribe to PSD
email alerts

Related links
Bosnia and Herzegovina homepage
Transport homepage

Project description
and objectives:

The proposed project will comprise a programme of track renewal on key sections of the north-south corridor Vc and the east-west section, which runs parallel to Corridor X, together with rehabilitation of the station signalling system and purchase of track machinery.

The project will also support the restructuring of the railways in BiH, through the separation of infrastructure from operations and joint financing with European Investment Bank of these important regional rail links.

Transition impact:

The project will facilitate transition in the following ways:

  • Approval of the new Railways Law

  • Creation of the BiH Infrastructure Management Company (ies)

  • Establishment of the State Regulatory Body

  • Accounting separation of passengers and freight operations within Railways of Federation of Bosnia and Herzegovina (ZBH) and Railways of Republika Srpska (ZRS).

  • Preparation and implementation of a restructuring plan

The client:

The Client will be the Government of Bosnia and Herzegovina.

The implementing agency will be Bosnia and Herzegovina Railways Public Corporation (BHRPC) on behalf of ZBH and ZRS.

EBRD finance:

EURO 70 million Sovereign Loan to Bosnia and Herzegovina.

Total project cost:

EURO 194 million.

Environmental impact:

The project is classified B/1.

The project is likely to improve the safety and environmental standards as well as improve operation and maintenance of the railway systems. The existing facilities will need to undergo an Environmental Analysis and Audit to identify and assess the current environmental, health and safety conditions and the likely impact of measures proposed under this project. The due diligence will need to review the status of the implementation of existing Environmental Action Plans and define measures for supporting the introduction of the modern environmental management in these two railway companies.

Technical
cooperation:

Technical co-operation funds are being sought for assistance for detailed design, procurement and railway restructuring.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Josip Polic, Operation Leader: policj@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.