Project name:Khujand Water Supply Improvement Project
Country:Tajikistan
Project number:34583
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:8 June 2004
Status:Signed
Date PSD disclosed:
Date PSD updated:
19 January 2004
Help

Subscribe to PSD
email alerts

Related links
Tajikistan homepage
Municipal and environmental infrastructure homepage
Khujand Water Supply Improvement Project, Tajikistan [Press Release]
EBRD loan whets Tajik water supply [Story]
Tajik water project targets disease, dilapidation [Story]

Project description
and objectives:

The proposed project comprises the following:

  • improvement of the Khodija Bakirgan water wells;
  • construction of transmission and connection mains;
  • refurbishment of a portion of the municipal distribution network;
  • installation of water meters;
  • purchase of workshop equipment;
  • installation of reserve wastewater pumps; and,
  • the preparation of detailed design and tender documents.

The Project will also include the following:

  • Preparation and implementation of a Financial and Operational Performance Improvement Programme for the Khujand Water Company (the Company).
  • Provision of a Stakeholder Participation Programme to encourage greater public participation in the delivery of water services, ensure poverty and subsistence issues are reflected in tariff reforms, and promote water conservation.

Transition impact:

Transition measures would focus on:

  • Water tariff reforms;
  • Greater stakeholder participation in tariff reform and service delivery;
  • More transparency and improved corporate governance;
  • Commercialisation of the Company;
  • Demonstration effect of directly financing a local government

The client:

The Bank's loan would be extended directly to Sogd Province with the proceeds invested by the Khujand Water Company. The loan would be backed by a sovereign guarantee from the Republic of Tajikistan.

EBRD finance:

Sovereign guaranteed loan of up to US$ 1.2 million (€ 1.0 million) to Sogd Province.

Total project cost:

Total project costs are estimated at US$ 4.2 million (€ 3.35 million).

Environmental impact:

The project has been screened B/1. The project offers the opportunity to improve drinking water management of the City of Khujand by providing reliable and sufficient water supply through reduction of water leakages. The project will also help to reduce energy consumption. Environmental due diligence was carried out as a part of the Feasibility Study.

Technical
cooperation:

Pre-Final Review:

  • Feasibility study including a review of the proposed investment programme and an environmental assessment.
  • Restatement of accounts of the Khujand Water Company in accordance with
  • International Financial Reporting Standards.
  • A Social Assessment to review social conditions, affordability, and willingness-to-pay.

Post signing:

  • Assistance to prepare and implement a Financial and Operational Performance Improvement Programme for the Company.
  • Assistance to prepare the final designs and tender documents and to support the Project Implementation Unit.
  • A Stakeholder Participation Programme to: encourage greater public participation in the delivery of water services, ensure poverty and subsistence issues are reflected in tariff reform, and, promote water conservation.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Bakhtiyor Faiziev, Operation Leader: faizievb@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback