Environmental Annex
In January 2004 the Bank's Environmental Specialist visited the port to conduct an Initial Environmental Examination (IEE) in order to determine any potential environmental risks and opportunities, consultation requirements and classification of this project.
Discussions were also undertaken with the Environmental Protection Agency regarding the Ministry of Water & Environment Protection requirements. The site visit confirmed that the location is not sensitive and there are unlikely to be significant environmental issues associated with the barge terminal construction. The project was therefore screened as B/1 requiring an Environmental Analysis. To ensure compliance with existing national and international environmental protection legislation, the Port has engaged independent environmental consultants to conduct an Environmental Impact Assessment.
The EIA will address both impacts and mitigation during construction and operation of the barge terminal along with conservation issues. Public consultation will be arranged to satisfy the local requirements, and a summary of relevant environmental issues and mitigation measures will be released locally. This will also build on a separate Environmental Impact Assessment Study of the entire port which was conducted in November 2001.
The results and recommendations of the EIA, Including a monitoring programme, will be taken into account in the Bank’s legal agreements.
As part of wider Port Commercialisation Enhancement Programme separately prepared for the Ministry of Public Works, Transport and Housing in 2001, an environmental action plan (including health and safety issues) has been developed to address key environmental risks and the provision of good environmental management.
A range of environmental related projects are currently being implemented to ensure future improvements throughout the port, in particular those related to Marpol Convention 73/78; the Strategic Action Plan for the Rehabilitation and Protection of the Black Sea and the EU Directive on port reception
|