Project name:Tashkent Water Supply Improvement Project
Country:Uzbekistan
Project number:29167
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:29 April 2003
Status:Signed
Date PSD disclosed:
Date PSD updated:
10 February 2003
Help

Subscribe to PSD
email alerts

Related links
Uzbekistan homepage
Municipal and environmental infrastructure homepage
EBRD to improve water quality for people of Tashkent [Press Release]
Projects in Uzbekistan [EBRD - Countries]

Project description
and objectives:

The proposed project would continue to support the reform process initiated by the ongoing Tashkent Solid Waste Management Rehabilitation Project, and expand this process to the water supply sector.The proposed project comprises the following:

  • The replacement of existing water pumps, valves and transformers as well as the installation of a water distribution unit, pumping station, water meters and construction of a reservoir.
  • Preparation and implementation of a Financial and Operational Performance Improvement Programme for the Tashkent Water Company (the “Company”).

Transition impact:

Transition measures would focus on:

  1. Tariff and subsidy reforms, which would move the Company towards full cost recovery while eliminating cross subsidies between industrial and domestic users.
  2. Improvement of the billing and collection systems of the Company.
  3. A review of options for possible private sector participation in the operations of the company.

The client:

The Bank's loan would be extended directly to the City of Tashkent with the proceeds invested by the Tashkent Water Company. The loan would be backed by a sovereign guarantee from the Republic of Uzbekistan.

EBRD finance:

Sovereign guaranteed loan of up to US$ 10.0 million to the City of Tashkent.

Total project cost:

Total project costs are estimated at US$ 14.5 million.

Environmental impact:

The project has been screened B/0. This project presents significant environmental opportunities regarding improving of quality of drinking water and reducing the threat to public health and safety. Environmental Analysis of the proposed improvement will be carried out as part of the Feasibility Study. It will include a review of environmental status of the existing facilities and will assess adequacy of the extension programme. It will also assess the ability of the proposed project to bring the facilities into compliance with applicable Uzbekistan and EU environmental standards.

Technical
cooperation:

Pre-Final Review:

  • Restatement of accounts in accordance to International Accounting Standards and assistance with financial due diligence of the Company.
  • Feasibility study comprising technical review and cost benefit analysis of the proposed Investment Programme, (ii) an Environmental Impact Assessment and (iii) a review of realistic possibilities for outsourcing and/or Public-Private Partnerships.

Post-Signing:

  • Financial and Operational Performance Improvement Programme for the Company.
  • International consultants to support the Project Implementation Unit.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Dilshod Akhundjanov, Operation Leader: akhundjd@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback