Project name:Regional Navigation Safety System in the Gulf of Finland
Country:Russia
Project number:26805
Business sector:Transport
Public/Private:Public
Environmental category:B
Board date:19 November 2002
Status:Completed
Date PSD disclosed:
Date PSD updated:
20 September 2002
31 January 2003
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Transport homepage

Project description
and objectives:

The Project represents Phase 2 of the development of Regional Navigation Safety System in the Gulf of Finland, and involves the proposed construction of 3 radio towers on the islands of Gogland, Seskar and Sommers.  These towers are to carry radars and radio communication equipment, equipment for the location and identification of ships and equipment for the transmission of information between ships and the shore.

Transition impact:

Safety improvements, reduced risks of environmental damage, increased efficiency of port services and enhanced state control would contribute to the improvement of the operations and image of St. Petersburg port.

The client:

Maritime Port Authority of St. Petersburg, a state institution established, owned and controlled by the Ministry of Transport of the Russian Federation

EBRD finance:

A proposed loan in the amount of USD 5.4 million (EUR 5.5 million) guaranteed by Russian Bank for Development, a Russian state-owned bank.

Total project cost:

USD 8.7 million (EUR 8.9 million)

Environmental impact:

The project was screened B/0. The Regional Navigation Safety System is a significant step in safeguarding the natural environment of an increasingly busy shipping lane. A major benefit likely to arise is a reduction in accidents involving hazardous chemicals and particularly oil and oil products. Information from HELCOM shows that the Gulf of Finland already has a high incidence of oil spillages. This may increase with the projected traffic growth (18,000 ship movements in 2001 projected to increase to 30,000 by 2010; around 4,000 ship movements p.a. involve oil or other hazardous cargoes) and the development of new major oil terminals.

The project assessment by independent consultants showed that the direct local environmental impact of the project (i.e. the construction of three unmanned communication towers on remote islands) is limited and can be addressed by appropriate site selection and working practises. All construction work (inclusive of docking of vessels; temporary storage of materials, temporary housing etc.) will need to be carried out with due regard for environmental protection and in compliance with all national environmental requirements. This will be closely monitored and reported to the Bank in the course of the project implementation.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Zhanar Rymzhanova, Operation Leader: rymzhanz@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback