Project name:Albania Power Distribution Rehabilitation
Country:Albania
Project number:23830
Business sector:Power and Energy
Public/Private:Public
Environmental category:B
Board date:9 July 2002
Status:Signed
Date PSD disclosed:
Date PSD updated:
9 April 2002
17 July 2002
Help

Subscribe to PSD
email alerts

Related links
Albania homepage
Power and Energy homepage
EBRD loan assists electricity rehabilitation in Albania [Press Release]
Albania’s power company struggles to meet expectations [Story]

Project description
and objectives:

Proposed €24 million loan to KESH to finance part of the Power Transmission and Distribution project (PTDP) with the aim of reducing technical and non-technical losses in the Albanian power system. The EBRD project will finance supply and install contracts for the rehabilitation and upgrade of the power transmission and distribution systems and substations in the following cities: Tirana, Kavaja, Korca, Berat and Lushnja.

Transition impact:

The project would support the stabilisation of the electricity sector by improving the system’s reliability and reducing losses as well as strengthening institutional reforms and sector management. Progress in these areas will allow Albania to attract qualified strategic investors to participate in a competitively tendered privatisation of the electericity sector, which Albania hopes to conclude in the next several years.

The client:

KESH, established in 1992, is the vertically integrated state-owned company responsible for the generation, transmission, and distribution of electricity within Albania and for trading electricity with foreign entities. KESH owns and operates 1,684 MW of installed generation capacity, a transmission network of 2,418 km and a distribution network of 45,512 km.

EBRD finance:

The proposed loan of approximately €24 million (phased into two tranches) will have a maturity of 12 years, including a 3 year grace period.

Total project cost:

€27.8 million. The total PDTP cost is estimated at €200 million. The PDTP project as a whole involves various other sector upgrade components. These are being financed in a co-ordinated manner with the EBRD component by the European Investment Bank and the World Bank (IDA) as well as by concessional co-financing from the Japan Bank for International Cooperation, and the Swiss, Italian, and Spanish Governments. KESH will also contribute co-financing to the EBRD and other components.

Environmental impact:

The project was screened B/1. An environmental assessment is being undertaken by international consultants.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Donald  Mishaxhi, Operation Leader: mishaxhd@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback