Project summary document

Project name:Slovalco Expansion - Equity
Country:Slovak Republic
Project number:7587
Business sector:General manufacturing
Public/Private:Private
Environmental category:B
Board date:27 March 2001
Status:Completed
Date PSD disclosed:
Date PSD updated:
19 March 2001
2 April 2001
Help

Subscribe to PSD
email alerts

Related links
Slovak Republic homepage
EBRD and Citibank support expansion of Slovalco [Press Release]

Project description
and objectives:

Proposed project to facilitate the expansion of Slovalco a.s., an aluminium smelter located in Ziar nad Hronom.

The project will facilitate the expansion of the Slovalco aluminium smelter. This is an essential step for the restructuring and privatisation of ZSNP.

Transition impact:

The expansion project will demonstrate that it is possible to invest in a viable part of a struggling Slovak industrial conglomerate and to consequently implement restructuring and expansion plans.

The client:

Slovalco is a subsidiary of ZSNP, the state aluminium monopoly. It was established to complete and operate a state-of-the-art smelter, allowing inefficient and polluting production units to be shut down. The EBRD and Hydro Aluminium have been shareholders in Slovalco since 1994.

EBRD finance:

The EBRD proposes to purchase additional voting shares and preference shares from ZSNP for US$ 62.6 million (€74.9 million).

Total project cost:

 

Environmental impact:

The project was classified as B/1, requiring an environmental analysis and audit. As part of the Bank’s original investment, a series of environmental covenants and an Environmental Remediation Programme were implemented. ZSNP’s two old Soderberg potlines and the Sinter and Bayer alumina plants, which caused serious environmental and health and safety concerns, have been permanently closed down. A new safely sealed hazardous waste storage facility has been built. A bentonite wall and a run-off water drainage system have been built around the red and brown mud pile to contain it and prevent further soil and groundwater contamination.

ZSNP will be required to spend part of the proceeds of the Bank’s financing on the completion of the Environmental Remediation Programme as a number of environmental issues are still outstanding. Slovalco and the EBRD are only indirectly responsible for the full implementation of the Environmental Remediation Programme, but the potential risk of the subsidence of the red mud pile and pollution of River Hron due to the delay in capping the pile could be of serious public concern. The environmental analysis and the audit have resulted in an update of the Environmental Remediation Programme. A letter undertaking with ZSNP and the Fund for National Property setting out a schedule for completion of the outstanding elements of the Environmental Remediation Programme will be required for the transaction to take place.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

 

EBRD contact:

Francois Lecavalier, Operation Leader: lecavalf@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback