Project summary document

Project name:Albania Power Sector Reconstruction
Country:Albania
Project number:8345
Business sector:Power and Energy
Public/Private:Public
Environmental category:B
Board date:16 November 1999
Status:Signed
Date PSD disclosed:
Date PSD updated:
18 October 1999
14 December 1999
Help

Subscribe to PSD
email alerts

Related links
Albania homepage
Power and Energy homepage
EBRD gives green light to new road development and power sector reconstruction in Albania [Press Release]
Projects in Albania [EBRD - Countries]

Project description
and objectives:

Modernisation of main hydro plants and transmission and distribution networks in Albania.

The project aims to:

  • provide sufficient electriity supply for the domestic markets by reducing commercial and technical losses;
  • achieve a 30 MW increase in generating hydro capacity; and
  • enhance the reliability and quality of electricity supply and reduce power cuts in the country.

Transition impact:

The project is expected to:

  • restore reliable supply of electricity in the region;
  • re-establish regional cross support; and
  • enhance KESH management skills.

By increasing the availability and reliability of power supply in Albania, the project will directly contribute to:

  • the mitigation of instability risks in the region; and
  • the recovery and future economic development of Albania.

The client:

Albanian power generation transmission and distribution are vertically integrated in a state-owned company, Korporata Elektroenergjetike Shqiptare (KESH).

EBRD finance:

The EBRD has signed a loan of EUR 30 million to KESH.

Total project cost:

EUR 60 million.

Environmental impact:

The project concerns the modernisation of two hydro power plants and the construction or improvement of transmission and distribution lines. The project replaces two existing modern-isation projects for which environmental due diligence studies were carried out, including an environmental impact assessment for a transmission line. Public consultation was also carried out for the previous projects. New project components (for example, a transmission line) will comply with relevant EU and international standards, and issues identified during environmental due diligence (e.g. PCB analysis of transformer oil) have either already been addressed or will be addressed as part of this new project. The project is expected to have an overall positive environmental impact by helping to replace polluting thermal power stations with hydro-power capacity and also by reducing transmission line losses.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Donald  Mishaxhi, Operation Leader: mishaxhd@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.