EBRD homepage
About the EBRD
News & events
Publications
Countries & topics
Projects
 
Project summaries

Approved & signed

Case studies

Environmental documents

Evaluation
Apply for financing
Environment
Capital markets
Working together
 

 

Project summary document

Project name:Italian-Romanian Industrial Development Enterprise
Country:Romania
Project number:4560
Business sector:Property
Public/Private:Private
Environmental category:B
Board date:27 October 1998
Status:Signed
Date PSD disclosed:
Date PSD updated:
1 October 1998
29 March 1999
Help

Subscribe to PSD
email alerts

Related links
Romania homepage
Property homepage

Project description
and objectives:

The company will develop, construct, let and manage a programme of modern international standard warehouse projects to be located in Romania.

Project objectives: The proceeds of the senior loan and the equity investment will be utilised to develop and construct a programme of international standard warehouse projects, relieving the severe shortage of modern warehousing facilities in Romania.

Transition impact:

The project will contribute to improving the efficiency in the supply chain through the use of modern warehousing and logistical systems, thus lowering the cost of logistics and increasing competition in the finished goods sector.

The client:

Italian-Romanian Industrial Development Enterprise (IRIDE) is a special-purpose property development company established in Romania by the Italian developer BPD Property Development S.r.l. IRIDE will be the first property development company in Romania to focus on developing light industrial and ancillary office facilities, primarily for large international companies manufacturing, assembling or distributing products in Romania.

EBRD finance:

The EBRD will provide a senior loan of US$ 9.0 million (ECU 7.7 million) to IRIDE and will make an equity investment in the company of US$ 2.4 million (ECU 2.1 million). A US$ 9.0 million (ECU 7.7 million) B loan will be syndicated to commercial banks.

Total project cost:

US$ 36.0 million (ECU 30.8 million)

Environmental impact:

The project was screened B/0, requiring an environmental analysis of the impact associated with the construction, equipment and operation of the warehouse and industrial buildings. The analysis highlighted the following issues.

To meet high standards of environmental, health and safety and to reduce environmental impact during the construction phase, the project will adopt the highest Western standards. Noise and dust levels will be kept to a minimum level.

Construction will be undertaken in accordance with Romanian and EU worker health and safety legal requirements and standards. Environmental due diligence, including soil and groundwater testing, will be undertaken at all sites by specialist environmental consultants. The development will comply with all local fire, safety and emergency procedures. Energy conservation measures will form a major part of the project. Increased traffic to the warehouse is not expected to create any problems, and traffic surveys will be conducted for major sites. There will be no environmentally damaging materials or substances (asbestos, formaldehyde, oil-cooled transformers etc.) used in the construction.

The sponsor will provide the Bank with an Annual Environmental Report documenting, among other things, any environmental issues, such as incidences of non-compliance, and updating the Bank on environmental initiatives taken by the project.

Technical
cooperation:

None

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

 

EBRD contact:

Marilena Vuiu, Operation Leader: vuium@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback