Project summary document

Project name:Georgia: Trans-Caucasian Rail Link Project
Country:Georgia
Project number:4455
Business sector:Transport
Public/Private:Public
Environmental category:B
Board date:10 November 1998
Status:Signed
Date PSD disclosed:
Date PSD updated:
18 December 1997
16 November 1998
Help

Subscribe to PSD
email alerts

Related links
Georgia homepage
Transport homepage

Project description
and objectives:

Priority investment and railway restructuring measures to assist the commercialisation of Georgian railways by improving the main international transit route from Baku to the Georgian ports.

The project aims to assist the commercialisation of Georgian railways by improving the main international transit route from Baku to the Georgian ports. It will also support the development of a more commercially oriented organisational structure and the ultimate conversion of Georgian railways into a joint-stock company or similar type independent legal entity.

Transition impact:

The project is expected to lead to the enactment of a new Railway Law. This will result in the separation of policy and operating responsibilities in the railway sector, with SR being established, initially as a government-owned commercial company.

The client:

Georgian railways (Sakartvelo's Rkinigza – SR).

EBRD finance:

Loan of US$ 20 million (ECU 17.8 million). Co-financing of US$ 7 million from the European Union's Tacis Programme.

Total project cost:

US$ 32 million (ECU 28.5 million).

Environmental impact:

The project has been categorised as B/0, requiring an Environmental Analysis. The investment project was preceded by a pre-investment study, which has identified potential environmental issues that may be associated with the investments and need to be assessed during project preparation. These issues include construction-related impact, such as pollution of soil and water resources, changes in local hydrology, noise and dust disturbance and disposal of spoil and other waste materials.

The project will be accompanied by an EU Tacis-TRACECA technical assistance project. The terms of reference for this provides for an environmental analysis of the proposed investments and for assistance to SR in developing an Environmental Management Plan. During the operation and maintenance phase adequate provision will be made for disposal of hazardous and non-hazardous solid wastes, water run-offs and possible increased noise along the railway corridors. As a condition of the Bank's involvement in the financing of the investments, SR will need to develop in-house capacity for environmental management and develop an Environmental Management Plan.

Technical
cooperation:

Project implementation assistance (US$ 0.6 million) and a restructuring study (US$ 0.6 million).

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Grigol Katsia, Operation Leader: katsiag@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380