Project summary document

Project name:Tashkent Solid Waste Management Rehabilitation
Country:Uzbekistan
Project number:4203
Business sector:Municipal and environmental infrastructure
Public/Private:Public
Environmental category:B
Board date:1 December 1998
Status:Completed
Date PSD disclosed:
Date PSD updated:
22 October 1997
4 December 1998
Help

Subscribe to PSD
email alerts

Related links
Uzbekistan homepage
Municipal and environmental infrastructure homepage
Tashkent will become a cleaner city with EBRD assistance [Press Release]

Project description
and objectives:

The project comprises upgrading the basic infrastructure for municipal and industrial solid waste management in Tashkent, Uzbekistan.

The main objective of the project is to restore the basic municipal and industrial waste collection and disposal services. Other objectives are to address urgent environmental problems and public health hazards, and to strenghten the institutional arrangements surrounding the municipal solid waste management in Tashkent.

Transition impact:

The project will help promote transition through:

  • opening the municipal solid waste management services for the private sector on a competitive basis;
  • commercialising service provision and creating an institutional framework that would promote competition and market efficiency; and
  • introducing the concept of cost recovery in the provision of municipal services.

The client:

The borrower will be the City of Tashkent.The loan will be guaranteed by the Republic of Uzbekistan.

EBRD finance:

The EBRD will provide a sovereign loan of US$ 19.2 million (Euro 16.3 million). The project will be co-financed with the World Bank.

Total project cost:

US$ 46 million (Euro 39 million).

Environmental impact:

The project was screened B/1. An environmental audit of current operations and an analysis of the project has been carried out by independent consultants. This study indicated that current operations constitute a major environmental and public health risk. Major issues will be addressed by the project. This includes investments in the upgrading of the waste collection system, the rehabilitation and closure of two unsafe landfill sites and the development of a third landfill site. It is expected that implementation of these key project components will result in significant environmental and public health and safety benefits. The project also includes a strategic planning component for the future development of the municipal waste disposal system of Tashkent, which provides an opportunity to bring the entire system in line with international environmental and health and safety standards.

Technical
cooperation:

Technical cooperation funding will be sought to support project implementation and the institutional strengthening programme for the system operator and the City of Tashkent.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Abbas Ofarinov, Operation Leader: ofarinoa@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.