Project summary document

Project name:Azerbaijan: Silk Road
Country:Azerbaijan
Project number:1863
Business sector:Transport
Public/Private:Public
Environmental category:B
Board date:8 June 2004
Status:Signed
Date PSD disclosed:
Date PSD updated:
4 July 1997
29 January 2001
Help

Subscribe to PSD
email alerts

Related links
Azerbaijan homepage
Transport homepage
EBRD lends Azerbaijan $41 mln to help revive 'Silk Road' [Press Release]

Project description
and objectives:

Reconstruction of an 85 km section of road from Gazi Mamed to Kyurdamir, together with assistance with road sector restructuring.

The project objectives are:

  • Reconstruction of the Gazi Mammed to Kyurdamir road; and
  • Assistance with road sector re-structuring.

Transition impact:

The project will assist with the restructuring of the RTSD and provide recommendations on road sector financing.

The client:

Road Transport Services Department (RTSD)

EBRD finance:

USD 41.0 million

Total project cost:

USD 46.6 million

Environmental impact:

Environmental summary

The environmental impact associated with the proposed rehabilitation of the existing road is unlikely to be significant (and would therefore normally be screened B 1 requiring an Environmental Analysis). The road is located in a sparsely populated area in the Mugan Desert, where the terrain is completely flat and the road runs in long straight lines of up to 40 km. However, the project might also involve the construction of a new bypass around Kyurdamir. Because of this project element an Initial Environmental Examination (IEE) will be carried out to assess potential impacts. Based on the findings of the IEE a screening category will be allocated and additional environmental due diligence carried out as required.

Western consultants have already carried out the environmental analysis as part of an overall feasibility study funded by TRACECA (Transport Corridor Europe/Caucasus/central Asia), an EC Tacis programme. This does not include the proposed bypass. The key issues that were identified were the restoration of borrow pits (quarries), road safety measures and the environmental impact related to construction. It also identified a number of "opportunities for positive environmental enhancement", including improvement of road safety, reduction of soil pollution at existing vehicle repair ramps and waste management.

Technical
cooperation:

Technical cooperation will be required for:

  • Engineering supervision;
  • Updating the project design; and
  • Lenders Monitor Advisor.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

EBRD contact:

Lin O'Grady, Operation Leader: ogradyl@ebrd.com

Procurement or tendering
opportunities:

Visit EBRD Procurement
Enquiries: Tel: +44 20 7338 6794; Fax: +44 20 7338 7472, Email: procurement@ebrd.com

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.