Project description and objectives:
|
The Project comprises a loan to Petrom for the construction of a new power plant on the grounds of the Petrobrazi refinery and associated infrastructure:
- 860MW Combined Cycle Power Plant (CCPP) at Petrobrazi Refinery complex;
- 30km (approximate) natural gas pipeline (800mm diameter) from the village of Butimanu (Dambovita County) to Petrobrazi Refinery complex (Prahova County); and
- 3km (approximate) overhead High Voltage (HV) power line connection from Petrobrazi Refinery complex to Brazi Vest substation and Romania National Grid.
The Project contributes to the revamping of the electricity sector in Romania, by improving environmental standards and efficiency. By increasing the presence of the private sector in the Romanian power generation sector, the Project stimulates competition and has the potential to facilitate other private investment through demonstration effects.
There is a project summary document available for this project.
|
Full EIA availability:
|
Full EIA documentation is available locally at:
EBRD's Business Information Centre in London
And
Brazi Town Hall, Brazi Village, Prahova County, Phone: 00 40 244 480 700;
Prahova EPA, Ms. Gabriela Munteanu, Head of Permitting Department, 306, Gh. Gr. Cantacuzino, Ploiesti, Prahova County, Phone: 00 40 244 544 134;
And
EBRD Resident Office in Romania
8 Orlando Street
Sector 1
Bucharest, Romania
Tel: +40 21 202 7100
Contact: Mihnea Craciun
And
Posted on the website of Petrom OMV Group – Gas, Power and Chemicals.
|