Project name:OGK-5 Capacity Replacement
Country:Russia
Project number:38700
Business sector:Power and Energy
State/Private:Private
Board date:25 November 2008
Status:Signed
Date EIA disclosed:
Date EIA updated:
24 September 2008
Help

Subscribe to EIA
email alerts

Related links
Russia homepage
Power and Energy homepage
OGK-5 Capacity Replacement [Project Summary Document]
EBRD in 12-year €120 million loan to Russian electricity generator [Press Release]

Project description
and objectives:

The Bank has been requested to finance the investment program of OGK-5’s Nevinnomysskaya GRES, a 1290 MWe gas-fired power plant located in Southern Russia. The Loan will finance the replacement of two inefficient gas-fired units (total capacity 310MW) with modern CCGT units (410MW) achieving enhanced environmental performance and adding 100 MW of generating capacity in this constrained region without increased utilisation of natural gas.

The project represents a major step in upgrading existing generating assets in Russia to ensure that they meet improved energy efficiency and higher environmental performance. The new project is part of a programme to improve the performance of existing plants in Russia and will result in lower carbon emission per MWe of generated electivity.

There is a project summary document available for this project.

EIA summary:

Executive Summary (English)  (1.1Mb)
Executive Summary (Russian)  (0.7Mb)

Public Disclosure and Consultation Plan (English)  (0.3Mb)
Public Disclosure and Consultation Plan (Russian)  (0.5Mb)

Full EIA availability:

Full EIA documentation is available locally at:
EBRD's Business Information Centre in London

The materials are available in hard copy at the following locations in Russia:

  • Nevinnomysskaya GRES Power Plant
    Contact: Ms Irina Ushakova
    Phone: (86554) 5-05-89, (86554) 5-01-11
    Fax: (86554) 5-05-89
    E-mail: Ushakova_ia@nevgres.ogk-5.com

  • OGK-5 Headquarters
    10A/2 4th Setunsky proezd
    Moscow 119136
    Contact: Mr Vasily Zakharov
    Phone: +7 (495) 380-02-30 ext. 5324
    Fax: +7 (495) 380-02-39
    E-mail: zakharov_vs@ogk-5.com

  • EBRD Regional Office in Moscow
    6 Gasheka Street
    Moscow 125047
    Contact: Mr Vadim Dormidontov, Senior Banker
    Phone: +7 (495) 787 1111
    Fax +7 (495) 787 1122
    E-mail: dormidov@ebrd.com

The EIA package and Executive Summary have also been released for public review by the project sponsor on its website:
http://www.ogk-5.com/ru/about_n/safety_n/
http://www.ogk-5.com/en/susta/envirpro/

and released locally in the following locations:

  • Nevinnomysskaya GRES Power Plant
    Contact: Ms Irina Ushakova
    Phone: (86554) 5-05-89, (86554) 5-01-11
    Fax: (86554) 5-05-89
    E-mail: Ushakova_ia@nevgres.ogk-5.com

  • Nevinnomyssk Public Library
    B. Mira 16-a
    Nevinnomyssk
    Stavropol Krai, Russia

Additionally the executive summary is available on the EBRD internet sites at www.ebrd.com

Enquiries:

Environmental enquiries:

  • At the power plant:
    Nevinnomysskaya GRES Power Plant, Department of Ecology
    Attn: Ms. Irina Ushakova
    Telephone: (86554) 5-05-89, (86554) 5-01-11
    Fax: (86554) 5-05-89
    E-mail: Ushakova_ia@nevgres.ogk-5.com

  • At OGK- 5 Headquarters:
    10A/2 4th Setunsky proezd
    Moscow 119136
    Attn: Mr Vasily Zakharov
    Phone: +7 (495) 380-02-30 ext. 5324
    Fax: +7 (495) 380-02-39
    E-mail: zakharov_vs@ogk-5.com

This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD.