Project description and objectives:
|
The proposed project is for the construction and operation of a Greenfield cement plant about 30 km north of Tirana. The project would also comprise two quarries in the vicinity of the site to supply the cement plant with raw materials. The start of production is likely to be in 2010.
The Bank is financing the project along side the International Finance Corporation (IFC).
The new plant has been designed to meet Albanian and European Union Environmental Standards.
There is a project summary document available for this project.
|
Full EIA availability:
|
Full EIA documentation is available locally at:
EBRD's Business Information Centre in London
Antea Office; Rruga Luigj Gurakuqi, Pallati 89, Section A, 10th floor; Tirana Albania Contact: Mrs. Teuta Dobi, phone 00 355 427 4778;
And
EBRD Regional Office in Tirana;. Torre Drin Building, 4th Floor; Abdi Toptani Street Tirana, Albanian ; Tel: +355 42 32898, Fax: +355 42 30580. Contact: Daniel Berg, Head of Office, email: bergd@ebrd.com
And
IFC Albania office Deshmoret e 4 Shkurtit, No. 34 Tirana, Albania; Telephone: (355-4) 280-650/1; Fax: (355-4) 240-590
And
A full copy can be downloaded from: www.titan-cement.com
|
Enquiries:
|
For project-related questions contact
Mr. Lefteris Garis
Country Manager,
Antea Sh.A
Rruga Luigj Gurakuqi, Pallati 89,
Section A, 10th floor;
Tirana
Albania
Tel: 00 355 427 4778
For general questions on the project contact
Mr Bylyku Adrian. Tel.: 00 355 6920 93726
Fpr social Issues contact:
Mrs Dobi Teuta. Tel.: 0 355 6920 90547
|