Project description and objectives:
|
The proposed project consists of construction of a new 750 kV power
transmission line.
This public sector project involves the construction and operation of two new
transmission lines: the 750 kV Rivne NPP – Kyiv transmission line of the total
length 353 km and the 135 km 750 kV Khmelnytsk NPP - Chernobyl NPP line
diversion to Kyiv substation.
The line and the diversion will be constructed along new routes and as part of
the assessment a number of alternative routes were considered.
The objective of this project is to increase the reliability of power supply
to consumers in Kiev region and improve the overall stability of the grid
system. Increased reliability of the power system will increase overall sector
efficiency will thus have indirect environmental benefits and facilitate
international co-operation in the sector.
There is a project summary document available for this project.
|
EIA summary:
|
ESIA Executive Summary (English)
(3.9Mb)
ESIA Executive Summary (Ukrainian)
(4.7Mb)
|
Full EIA availability:
|
Full EIA documentation is available locally at: EBRD's Business
Information Centre in London
And
Larysa
Vorobei Ukrenergo office Kyiv 25 Kominiterna Street Room
25 Tel: 38 044 238 30 44 Fax: 38 044 249 18 47 email: Snezhko@nec.energy.gov.ua
And EBRD
Regional Office Kiev , 27/23 Sofiyvska Street Tel: + 380 44
270 61 32 Contact Olga Yeriomina Email: yerimino@kev.ebrd.com
And
http://www.ukrenergo.energy.gov.ua
And
Rivne
region
Matchuk V.Y. Head of Administration Rivne
State Regional Administration, Town of Rivne, Prosvita Sq., 1 tel.
+380362247487
Borovets А.P. Head Rokytne
State District Administration, Township of Rokynte, Nezaleznosti
Str., 13 tel. +380363522090
Bobryk О.О. Head
of Administration Volodymyrets State District Administration Township
of Volodymyrets, Grushevskiy Str., 56 tel. +380363423300
Bagniy
V.S. Head of Administration Sarny State District
Administration, Town of Sarny, Radyanska Str., 51 tel.
+380365532320
Korovkin V.О. Head Kuznetsovsk
Town Council Town of Kuznetsovsk, Maidan Nezalezhnosti Str., 1, tel.
+380363621818
Zhytomyr region
Pavlenko
Y.O. Head of Administration Zhytomyr State Regional
Administration, Town of Zhytomyr, Rad Sq., 1 tel. +380412372114
Chernykh
V.S. First Deputy Head of Administration Olevsk State District
Administration, Town of Olevsk, Svyatomykolaivska Str., 4 tel.
+380413521857
Pavlenko А.А. Head of
Administration Radomyshl State District Administration, Town
of Radomyshl, Sobornyi Sq., 12 tel. +380413242167
Chenkov
М.М. Head of Administration Chernyakiv State
District Administration, Town of Chernyakhiv, Radyanska Sq., 1 tel.
+380413421697
Lisovyi P.S. Head of Administration Yemilchyne
State District Administration, Township of Yemilchyne, Lenina Str.,18 tel.
+380414942436
Braton О.G. Head of Administration Korostyshiv
State District Administration, Town of Korostyshiv, Cervona
Sq., 18 tel. +380413036283
Adamovych P.О. Head
of Administration Volodar-Volynsk State District Administration, Township
of Volodar-Volynsk, Karl Marks Str., 6 tel. +3804124531245
Linevych
V.V. Deputy Head Chervonoarmiysk State District Administration Town
of Chervonoarmiysk, Lenina Str., 123, tel. +380413131614
Kiev
region
Ulyanchenko V.І. Head of
Administration Kyiv State Regional Administration, City of
Kyiv, Lesya Ukrainka Sq., 1 tel. +380442868230
Zabela
Y.V. Head of Administration Makariv State District
Administration, Township of Makariv, Frunze Str., 30 tel.
+3827851444
|
Enquiries:
|
Larysa Vorobei Deputy Head of Investment Project Design Department Ukrenergo Tel:
38 044 238 30 44 Fax: 38 044 249 18 47 email: oks1@nec.energy.gov.ua
|
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD. |
| |