Project description and objectives:
|
Construction of a combined cycle power station fuelled by distillate oil
located 6 km north of Vlore adjacent to an off-shore oil tanker terminal. The
plant size would be 85MW - 135MW depending on the configuration of the winning
equipment bid. Construction works for the thermo power plant will be done
through a single Engineering, Procurement and Construction contract (EPC
contract) expected to be completed in 24 months. The client is KESH, the state
owned company responsible for the generation, transmission and distribution of
electricity in Albania. The project implementation will be managed by KESH
through its Project Implementation Unit (PIU).
The project would continue to consolidate the transition impact of the
existing EBRD power projects in Albania (sector reconstruction and
distribution rehabilitation), which have extensive objectives that include
readjusting tariffs to cover costs, improving collection of receivables,
eliminating subsidies for budgetary and non-budgetary entities, reducing
electricity losses, implementing a sector reform strategy and extending the
current management contract for KESH.
The project would help to reduce reliance on hydro generated power in Albania
and to ensure continuous provision of electricity. The project would support
the creation of a TSO, the creation of an Equalizing Fund (to build fund
reserves in good hydrological years) and functioning of a Reserve Fund for
Social Protection.
There is a project summary document available for this project.
|
EIA summary:
|
Executive summary
(0.1Mb), Albanian
(0.1Mb)
|
Full EIA availability:
|
Full EIA documentation is available locally at:
KESH office
in Vlore Tel & Fax: +355 33 22 28 41 Contact: Aleksander
Dumani
And
KESH, Public Relations Office, Blloku Vasil Shanto, Tirana, Albania, Mr
Fatmir Hoxha, Tel: +355 4 23 45 01
And
EBRD Resident Office in Albania, Rruga Abdi Toptani, Torre Drin, 4th
floor, Tirana, Albania Mr Giulio Moreno, Head of Office, Tel
+355 4 232 898
And
KESH website: http://kesh.com.al/
And
The World Bank website: http://www.worldbank.org
And
EBRD’s Business Information Centre
in London
|
Enquiries:
|
Environmental enquiries:
Mr Fatmir Hoxha, KESH Address: Blloku Vasil Shanto, Tirana, Albania Fax:
+355 4 23 45 01 E-mail: HoxhaF@kesh.com.al
General enquiries:
Mr Elton Rradheshi, Office of CEO,KESH Address: Blloku Vasil Shanto,
Tirana, Albania Fax: +355 4 23 20 46 E-mail: RradheshiE@kesh.com.al
|
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD. |
| |