EBRD homepage
About the EBRD
News & events
Publications
Countries & topics
Projects
 
Project summaries

Approved & signed

Case studies

Environmental documents

Evaluation
Apply for financing
Environment
Capital markets
EBRD blog
Working together
 

 

Environmental impact assessment

Project name:National Power Transmission Co. "Transelectrica" SA
Country:Romania
Project number:33354
Business sector:Power and Energy
State/Private:State
Board date:2 November 2004
Status:Signed
Date EIA disclosed:
Date EIA updated:
1 July 2004
Help

Subscribe to EIA
email alerts

Related links
Romania homepage
Power and Energy homepage
National Power Transmission Co. "Transelectrica" SA [Project Summary Document]
BERD sprijina piata de energie electrica est – vest [Press Release]
BERD sprijina piata de energie electrica est – vest [Press Release]
EBRD supports east-west electricity market [Press Release]

Project description
and objectives:

The proposed project involves the construction and operation of an overhead transmission line (OHTL) of 400 kV nominal voltages between the town of Oradea (Romania) and Békéscsaba (Hungary) at the Romanian-Hungarian border. The  OHTL on the Romanian territory consists of two distinct sections:

  • Single circuit section of 74 km between Oradea South and Nadab, laid on 211 single circuit RODELTA-type steel towers; and
  • Double circuit section of 23 km between south Nadab and the mile stone no. 54 at the Romanian-Hungarian border, laid on 67 double circuit DONAU-type steel towers.

The new OHTL will allow Romania to integrate its electricity systems with the European network through an interconnection between the Romanian power utility Transelectrica and the Hungarian power utility “MVM”. It will bring benefits to both UCTE system security and regional electricity market. It will also close the internal transmission ring in the Romanian northwest area and increase the reliability of the transmission system operation. The above project structure will allow both power systems (Romanian and Hungarian) to maximize the economic and technical benefits provided by the new interconnection.

There is a project summary document available for this project.

EIA summary:

Executive summary (English)  (0.4Mb)
Executive summary (Romanian)  (0.4Mb)

Full EIA availability:

Full EIA documentation is available locally at:

Agentia de Protectia Mediului Arad
municipiul Arad,
Bdl. Dragalina, nr.16

tel/fax 40 257 280996, 280331, 281461

Contact person: Adina Orasan

Agentia de Protectia Mediului Bihor
municipiul Oradea,
Bdl.Dacia, nr.25A

tel/fax: 40 259 440590

Contact person: Mariana Vasiu

And

EBRD Resident Office
8 Gina Patrichi Street
Sector1,
Bucharest

Tel: +40212027100
Fax:+40212027110

And

Enquiries:

Mr Razvan Purdila
Director Investment Projects Management Division
Transelectrica S.A.
33 General Gh.Magheru Blvd.
Bucharest - 1, RO-70164
Romania

Tel: 0040 21 303 5616
Fax: 0040 21 303 5660

email: rpurdila@transelectrica.ro


This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD.
Terms and conditions Sitemap Feedback